BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Wind Gap, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project involves the replacement of the existing single span SR 33 NB and SB structures over Bushkill Creek. and other miscellaneous construction details, as indicated on the approved drawings and included in the bid package for STATE ROUTE 33, SECTION 05B, in NORTHAMPTON COUNTY in PALMER TOWNSHIP AND STOCKERTOWN BOROUGH from approximately SR 1002 (Main St) at segment 0110 NB/ 0111 SB offset 1609/ 1574 to approximately SR 191 (Industrial Blvd) at segment 0120 NB/ 0131 SB offset 2587/ 0069. Project Cost Range: $15,000,000.00 - $19,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 48.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE 408 Version: 2020-5 Special Provisions: Other: Added: (1) Project Specific - Structure Foundation Soil Profiles Modified: (1) Federal Wage Rate - 12/16/22 PENNDOT- PA 33 Bushkill Creek Bridges *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$21,771,122.00

Public - State/Provincial

Paving, Site Work

364

7

31

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
389
Active Projects
162
Bidding Soon
3,642
All Active Projects
1,688
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

February 27, 2023

img_map_placeholder

PA-33, Wind Gap, PA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.