EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 24, 2023 at 7:00 PM

Updated January 26, 2024

Site work, new construction and renovation of a mixed-use development in Willamina, Oregon. Completed plans call for the construction of a municipal facility; for the renovation of a municipal facility; and for site work for a water / sewer project.

The Project generally consists of installation of 3,352 linear feet (LF) of 12-inch diameter, fused C900 polyvinyl chloride (FPVC) raw water pipeline within an existing public right-of-way and a utility easement (PUE); installation of 3,090 LF of 12-inch FPVC diameter distribution main within public roads and greenfield PUEs; installation of 540 LF 8-inch diameter PVC water pipeline; construction of a new CMU block building; installation of a fire pump with variable frequency drive (VFD); installation of VFDs with sine wave filters onto existing booster pumps; installation of an emergency generator; replacement of the existing SCADA and controls system, and all labor, Equipment, Materials, and incidentals necessary to complete the Work as specified. This project is funded whole or in part by local funds and the following funding Agency Partners (Agency): . Federal Safe Drinking Water Revolving Loan Fund (SDWRLF) . Federal Community Development Block Grant CARES Act Funding, Impact Assistance Public Facilities Grant (CDBG-CV) . Yamhill County ARPA Grant . U.S. Environmental Protection Agency (EPA) Community Grant Bidders shall comply with Agency requirements, including American Iron and Steel (AIS) and Buy American Sourcing requirements (i.e., BABA), as included in these specifications and submit the required forms. Questions regarding the project should be referred to Jeff Brown, Public Works Director (brownj@ci.willamina.or.us), Luke Tabor, EI, Project Engineer, Keller Associates, (ltabor@kellerassociates.com), and Shannon Williams, PE, swilliams@kellerassociates.com. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. This is a public work contract subject to ORS 279C. 800 to 279C.870 and the federal prevailing rate of wage required under the Davis-Bacon Act (40 U.S.C. 276a) and related acts, and any amendments in effect at time of solicitation. Both State and Federal prevailing wage laws apply. Oregon law requires that the higher of the State prevailing wage rates or Federal Davis-Bacon Act prevailing wage rates be paid to workers on projects subject to both the State prevailing wage rate law and Federal Davis-Bacon Act. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items and Scheduled items as indicated in the Bid Form. Bid security shall be furnished in accordance with the Instructions to Bidders. The successful bidder will be required to furnish to the Owner a performance bond and a payment bond each equal to one hundred percent (100%) of the amount of the bid. The successful bidder and all subcontractors will be required to furnish to the Oregon Construction Contractors Board a public works bond in the amount of five percent (5%) of Bidder's maximum Bid price (determined by adding the base bid, Schedule A, and all alternates), unless exempt under ORS 279C. The Owner reserves the right to reject any and all bids, to waive any irregularities, and to accept the bid deemed in the best interests of Owner. Owner may reject any bid not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all bids upon a finding of the agency, if it is in the public interest to do so. The Contractor shall note that this is a public works contract subject to subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). As such, preference shall be given to qualified Section 3 Business Concerns when awarding the Contract. Additionally, this calls for affirmative action by the Contractor to train and/or hire Section 3 Workers and to Subcontract with Section 3 Business Concerns. Section 3 businesses must meet minimum qualifications, including prequalification with the City, and have the ability and capacity to perform successfully under the terms and conditions of the proposed contract. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron and steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. This project is financed with federal monies that may be subject to statutory requirements commonly known as "Build America, Buy America" provisions of the Infrastructure Investment and Jobs Act (IIJA) (P.L. 117-58, 70911-70917). The Buy America Sourcing requirements under the IJLA requires all of the iron and steel, manufactured products, and construction materials used in the project to be produced in the United States (Build America, Buy America [BABA] Requirements). Project entails installation of 540 555 linear feet (LF) of 8-inch diameter C900 polyvinyl chloride (PVC) water pipeline; trench excavation; shoring; pipe bedding; pipe zone backfill; general backfill; pipe anchors; ductile iron, corrosion coated, restrained, mechanical fittings, joints and valves; disinfection and pressure testing; construction of a new CMU block building; installation of a fire pump with VFD; installation of VFDs with sine wave filters onto existing booster pumps; installation of a new emergency generator, and replacement of the existing SCADA and controls system

Award

Water / Sewer

$4,286,103.00

Public - City

New Construction, Renovation, Site Work

79

44

47

11

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Storm Water Pollution Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Gypsum Sheathing, Shop-Fabricated Structural Wood
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Siding, Flashing and Sheet Metal, Flexible Flashing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Bowls, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters, Radiant Heating Units, Radiant-Heating Electric Panels
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Trenching and Backfilling, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining, Tunnel Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Dies
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
48
Bidding Soon
799
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

March 10, 2023

img_map_placeholder

Multiple Locations, Willamina, OR


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Water System Improvements Project A

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.