BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Medina, Ohio. Completed plans call for site work for a road / highway.

Bids are requested for the Chippewa Lake Main Drive Overlay Project in Medina County as detailed in the Bid Documents. The following individual will be responsible for answering any questions directed to the web service: Dan Becker Medina County Engineers Office Phone: 330-723-9556 Email: dbecker@medinaco.org Said improvement project will involve the overlay of the existing County Spec 405 Motorpave drive and the application of one 2" lift of County Spec 405 Motorpave and Item 422 Chip Seal. The project will include stipulated traffic control in accordance with the specifications and accompanying construction drawings. No contract shall be awarded at a price more than ten percent in excess of the Engineers estimate. Work shall be completed no later than July 28, 2023. Each bidder shall be required to file a bid guaranty with the bid in the form of either: (1) a Bid/Performance Bond in the amount of one-hundred percent (100%) of the amount bid; or (2) a certified check, cashier's check or letter of credit in an amount equal to ten percent (10%) of the amount bid, conditioned that the bidder shall, if his bid is accepted, execute a contract in conformity with the bid, plans, details, specifications and bills of material. A letter of credit shall be revocable only at the option of the County. Contractor compliance with the equal employment opportunity requirements detailed in the Bid Documents shall be required. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of their project. Additionally, contract compliance with the Equal Opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and the Governor's Executive Order 84-9 shall be required. Contractors and Subcontractors must comply with the prevailing wage rates requirements detailed in the Bid Documents. The bid will be awarded to the lowest and best bidder. The Medina County Board of Commissioners reserve the right to reject any and all bids.

Bid Results

Roads / Highways

$69,701.00

Public - County

Site Work

5

4

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
64
Bidding Soon
972
All Active Projects
384
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2023

February 27, 2023

img_map_placeholder

Multiple Locations, Medina, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.