BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Lake Stevens, Washington. Completed plans call for the renovation of a one-story above grade educational facility.

Bid date has been extended from 1/26/23 to 2/9/2023. The Lake Stevens School District No. 4 (District) is soliciting bids for tenant improvements to restroom facilities within an existing one-story classroom building. Base Bids and Bid Securities received after this time may not be accepted. All Bids must be submitted in sealed envelopes with the Bidder's name, address, the name of the project and the deadline date and time appearing on the OUTSIDE of the envelope. It is the sole responsibility of the Bidders to see that their Bids are delivered by the designated time. No responsibility will be taken by the District for wrong delivery by any Bidder, for delays in the US Mail or delivery services, or internal district mail, or for misaddressed or misrouted Bids Each Bid shall be accompanied by a bid bond, cashier's check, or certified check made payable to Lake Stevens School District No. 4 in an amount of not less than five percent of Bidder's Basic Bid. The Owner reserves the right to accept the lowest or any other Bid, the right to reject any or all Bids, and the right to waive any irregularities in any Bid. No Bid may be withdrawn, except with the express permission of the Owner, after the hour set for the opening thereof, unless the award of Contract is delayed for a period exceeding 45 days. Bidders' attention is directed to State and Federal laws concerning wages, working hours and other conditions of employment and all requirements for public works construction. Contract is subject to Washington State L&I Prevailing Wage Rates effective on the Bid date. The Contractor may proceed with the Work on site starting on June 19, 2023. With coordination with the Owner, limited staging may occur prior to that date provided school activities are not impacted. The Work shall be Substantially Complete on August 25, 2023.

Award

Educational

$260,400.00

Public - City

Renovation

16

20

4

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
35
Bidding Soon
1,019
All Active Projects
428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

June 19, 2023

img_map_placeholder

2908 113th Ave NE, Lake Stevens, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.