EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a municipal facility in Marina, California. Completed plans call for site work for a municipal facility.

Module 7 Phase 3 - Excavation and Liner Project Manager: Guy R. Petraborg, P.E. gpetraborg@mrwmd.org (831) 264-6385 ARCHITECT/ENGINEER: Golder Associates, Inc. Jeffrey Dobrowolski, P.E. 1000 Enterprise Way, Suite 190 Roseville, California, 95678 Phone: (916) 786-2424 CALL FOR BIDS: You are invited to bid on a General Contract for the construction of a lined solid waste disposal cell at the Monterey Peninsula Landfill, a Class III municipal solid waste landfill. Work includes excavation of native sand and clay soils, subgrade preparation and landfill liner system. All prospective general contract bidders are welcome to schedule a pre-bid walk through of the project site to be held at the MRWMD facility. An appointment can be scheduled by emailing gpetraborg@mrwmd.org. Each bid shall be accompanied by a certified or cashier's check or bid bond in the amount of 10 percent of the total bid price payable to the MRWMD as a guaranty that the bidder, if his/her proposal is accepted, will promptly execute the contract, secure payment of worker's compensation insurance, and furnish a satisfactory faithful performance bond in the amount of 100 percent of the total bid price The successful bidder must be licensed in the State of California, be registered with the State of California Department of Industrial Relations as a Public Works Contractor, and must demonstrate acceptable experience of the type of work described in the Bid Documents. MRWMD reserves the right to waive any irregularities and to reject any or all bids. Dated: January 3, 2023 MONTEREY REGIONAL WASTE MANAGEMENT DISTRICT Published:

Award

Municipal

$7,991,500.00

Public - City

Site Work

15

8

9

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, First Aid Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Fuel Distribution Utilities, Natural-Gas Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
33
Bidding Soon
1,053
All Active Projects
438
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2023

April 7, 2023

img_map_placeholder

14201 Del Monte Blvd, Marina, CA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Module 7 Base Liner System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.