BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2023 at 7:00 PM

Updated January 26, 2024

Demolition, site work and new construction of a civil project in Galena Park, Texas. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

For furnishing all labor, material, and equipment and performing all work required for the construction of Sanitary Sewer Rehabilitation & Sanitary Sewer Lift Station Rehabilitation. Scope of Work: Providing the necessary materials, equipment, supervision, labor and appurtenances to construct 30 new sanitary manholes, 83 cleanouts, approximately 67,300 LF pipe bursting existing sanitary lines of varying sizes, rehabilitate existing manholes, and reattach existing sanitary sewer service connections and all appurtenances necessary for a complete sanitary sewer installation. Replacement of two existing lift stations with 8-feet diameter (ID) duplex lift stations, including site work and all appurtenances to construct two fully functional lift stations and sites. Also includes the installation of a new 18" sanitary sewer gravity line down Keene Street. This project will be federally funded by the U.S. Housing and Urban Development (HUD) Department through the Texas General Land Office (GLO) and administered by the Harris County Community Services Department (HCCSD). Bidders shall comply with regulations governing the CDBG Disaster Recovery Program (Regulation 24 CFR 570). Applicable requirements include but are not limited to compliance with the Davis-Bacon and Related Acts, Fair Labor Standards, Equal Employment Opportunity, Affirmative Action, Section 3 of the HUD Act of 1968, and contracting with small, minority, and disadvantage firms, as detailed in the project manual. Accompany Bids with acceptable Cashier's or Certified Check in the amount of five percent (5%) of the total amount bid, payable without recourse to the City, or a Bid Bond of like amount from an approved surety company, as a guarantee that bidder will enter into a contract.

Bid Results

Water / Sewer

$9,300,161.00

Public - City

Demolition, New Construction, Site Work

242

20

9

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
4
Bidding Soon
1,984
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2023

April 24, 2023

Project location map

Multiple Locations, Galena Park, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.