Published February 15, 2023 at 7:00 PM

Updated January 26, 2024

Site work and new construction of a civil project in Glenwood, Iowa. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; and road / highway.

The Project includes the following Work: Project Contract No. 1 - construction of a 150,000 gallon elevated water storage reservoir complete with foundations, painting, piping, valving, fire hydrant, grading, seeding, fencing, crushed rock driveway, and misc. appurtenances. Project Contract No. 2 - construction of a water pumping station, with pumps, motors, pump cans, piping,valving, metering, electrical controls, control system, standby generator, grading, seeding, crushed rock driveway, and misc. appurtenances Bidder shall not include sales tax in the bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. Glenwood Municipal Utilities reserves the right to defer acceptance of any bid for a periodof sixty(60)calendar days after receipt of bids and no bid may be withdrawn during this period. Each bid must be accompanied by bid security, as defined in Iowa Code Section 26.8, intheamountof5%of the Bidder's maximum bid price, as specified in the Instructions to Bidders. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to100%ofitscontract price. Said bond shall be issued by a responsible surety approved by GlenwoodMunicipal Utilitiesand shall guarantee the faithful performance ofthe contract and the terms and conditionsthereincontainedand shall guarantee the prompt payment of all material and labor, and protect and save harmlessGlenwoodMunicipal Utilities from claims and damages of any kind caused by the operations of thecontract andshallalso guarantee the maintenance of the improvement caused by failures in materials andconstructionforaperiod of two years from and after acceptance of the contract. To the extent allowed by Federal law and regulation, by virtue of statutory authority, a preferencewill begiven to products and provisions grown and coal produced within the State of Iowa. Work on the Project shall commence upon the issuance of a written Notice to Proceed. Contractorshallfully complete the project by (no later than) September 22, 2023. Should the contractor fail tocompletethe work in this timeframe, liquidated damages of $250.00 per calendar day will be assessedfor worknotcompleted within the designated contract term. Glenwood Municipal Utilities does hereby reserve the right to reject any or all bids, towaiveinformalities,and to enter into such contract, or contracts, as it shall deem to be in the best interest of thejurisdiction. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A-Agriculture, RuralDevelopment, Food and Drug Administration, and Related Agencies Appropriations Act, 2017)andsubsequent statues mandating domestic preference applies an American Iron and Steel requirementtothisproject. All iron and steel products used in this project must be produced in the UnitedStates. Theterm"iron and steel products" means the following products made primarily of iron or steel; linedorunlinedpipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipeclampsandrestraints, valves, structural steel, reinforced precast concrete, and Construction Materials. Thefollowingwaivers apply to this contract: De Minimis, Minor Components, Pig iron and direct reducediron.

Post-Bid

Water / Sewer

$4,000,000.00

Public - City

New Construction, Site Work

11

15

4

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Accessories, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Roof Windows and Skylights, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Acoustic Treatment, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
26
Bidding Soon
507
All Active Projects
207
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

April 17, 2023

img_map_placeholder

Multiple Locations, Glenwood, IA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2022 Water System Pumping and Storage Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.