BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fitness / recreation center in Clermont, Florida. Completed plans call for the renovation of a fitness / recreation center.

The purpose of this quote is to receive responses from qualified respondents for the 50 Gallon Water Heater Replacement for Clermont Arts and Recreation Center in accordance with the terms, conditions, and specifications contained herein. The City of Clermont is accepting quotes for a 50 Gallon Water Heater replacement. All units must be new with a full manufacturer's warranty on all components. Respondents shall provide experienced technicians to perform all labor and provide all materials, tools, equipment, permits and licensing necessary to perform the work. Successful respondent is solely responsible for the safety of their employees and sub-contractors relative to the work, work procedures, material, equipment, transportation, signage and related activities and equipment. Provide material, equipment, labor, and tools to complete the following scope of work Water heater and motor must be similar products Turn off water to the water heater and drain down heater. Disconnect water heater from existing copper water lines. Disconnect water heater from existing electrical connection. Remove and dispose of existing 50 gallon electric water heater. Provide and install a new AO Smith DRE52-24kw-480V-3PH 50 gallon water heater. Provide and install a new atmospheric vacuum breaker and thermal expansion tank. Make connections to existing copper water lines with new type L copper pipe and pro press fittings. Provide a new ball valve for recirculation line connection to cold water line. Connect to existing electrical line. Fill up system and purge of any air. Turn on heater and test for leaks and proper operation. Set heater temperature to factory setting of 120 degrees. Replacement of Grundfos circulation pump above water heater with a new Grundfos UPS15-35SFC Remove all equipment, and clean jobsite Provide a one (1) year manufacture warranty and one (1) year labor warranty All work to be performed normal working hours Monday through Friday; 8AM-5PM Question Deadline: January 25, 2023, 3:00pm As the best interests of the City may require, the City reserves the right to make an award on the lowest price basis by individual item, group of items, all or none, or a combination thereof; with one or more respondent(s); to reject any and all responses or waive any minor irregularity or technicality in responses. Quotes are considered as informal solicitations and will not be read at a public opening. The quote result will be available through OpenGov after being reviewed and verified. The award will be done with reasonable promptness to the respondent that meets the specifications and timeframe. The City of Clermont is accepting quotes for a 50 Gallon Water Heater replacement. All units must be new with a full manufacturer's warranty on all components. Respondents shall provide experienced technicians to perform all labor and provide all materials, tools, equipment, permits and licensing necessary to perform the work. Successful respondent is solely responsible for the safety of their employees and sub-contractors relative to the work, work procedures, material, equipment, transportation, signage and related activities and equipment. o Provide material, equipment, labor, and tools to complete the following scope of work o Water heater and motor must be similar products o Turn off water to the water heater and drain down heater. o Disconnect water heater from existing copper water lines. o Disconnect water heater from existing electrical connection. o Remove and dispose of existing 50 gallon electric water heater. o Provide and install a new AO Smith DRE52-24kw-480V-3PH 50 gallon water heater. o Provide and install a new atmospheric vacuum breaker and thermal expansion tank. o Make connections to existing copper water lines with new type L copper pipe and pro press fittings. Provide a new ball valve for recirculation line connection to cold water line. o Connect to existing electrical line. o Fill up system and purge of any air. o Turn on heater and test for leaks and proper operation. o Set heater temperature to factory setting of 120 degrees. o Replacement of Grundfos circulation pump above water heater with a new Grundfos UPS15-35SFC o Remove all equipment, and clean jobsite o Provide a one (1) year manufacture warranty and one (1) year labor warranty o All work to be performed normal working hours Monday through Friday; 8AM-5PM

Post-Bid

Fitness / Rec Centers

$60,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
171
Bidding Soon
2,804
All Active Projects
1,147
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 1, 2023

March 3, 2023

March 29, 2023

img_map_placeholder

3700 S Hwy 27, Clermont, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.