EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 7, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Winchester, Kentucky. Completed plans call for site work for a water / sewer project.

For Flanagan and Madison Outfall Sewer Improvements-Phase 1 The work to be bid is described as follows: CONTRACT 587-18-01 Approximately 6,200 L.F. of upsizing existing sewer (8-inch through 24-inch) and manholes. If forwarded by mail, the sealed envelope containing the proposal must be enclosed in another envelope and mailed to the Winchester Municipal Utilities, 150 North Main Street, Winchester, Kentucky 40391, allowing sufficient time for such mailing to reach this address prior to the scheduled closing time for receipt of proposals. Bids shall be accompanied by a certified check or bid bond made payable to Winchester Municipal Utilities, Kentucky, in an amount not less than the percent of the base bid indicated in Specification Section C-200, Instructions to Bidders, Bid Security. No bidder may withdraw his bid for a period of 90 days after the date bids are opened. He may, however, withdraw his bid at any time prior to the time and date scheduled for opening of same or any authorized postponement thereof. Any bid received after the time and date specified shall not be considered and will be returned unopened to the bidder. The attention of all Bidders is directed to the fact that funds will be available for the award of this Contract from the Kentucky Cleaner Water Program, provided through the American Rescue Plan Act of 2021. Bidders must comply with the President's Executive Order Nos. 11246 and 11375, which prohibit discrimination in employment regarding race, creed, color, sex or national origin. Where the President's Executive Order No. 11246 is shown, Executive Order No. 11375 also applies. Bidders must make positive efforts to secure small or minority owned business enterprise participation in this Project. Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, the Contract Work Hours Standard Act, and the Davis-Bacon Act. Bidders must certify that they do not and will not maintain or provide for their employees any facilities that are segregated or based on race, color, creed, or national origin. Bidders must show a certification of prior work under Executive Order 11246 (Equal Employment Opportunity) as amended. All contractors and subcontractors must comply with 41 CFR 60-4, in regard to affirmative action. This is to insure equal opportunity to females and minorities, and apply the time tables and goals set forth in 41 CFR 60-4. Neither the United States nor any of its departments, agencies or employees is or will be a party to this Invitation for Bids or any resulting contract. This procurement is subject to the requirements outlined in the Kentucky Infrastructure Supplemental General Conditions. Winchester Municipal Utilities may consider informal any bid not prepared and submitted in accordance with the provisions of this advertisement and/or the Specifications and may waive any informalities or reject any and all bids.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

16

16

2

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Glazing, Mirrors
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
38
Bidding Soon
438
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2023

April 7, 2023

img_map_placeholder

Multiple Locations, Winchester, KY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Flanagan and Madison Outfall Sewer Improvements, Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.