EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 17, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Winchester, Kentucky. Completed plans call for the renovation of a educational facility.

The project consists of the installation of new wood athletic flooring in the existing school gym. Existing door modifications and existing bleacher removal and reinstallation are required. Each Proposal shall be submitted on forms contained in the Project Manual. Proposals shall be enclosed in a sealed envelope with the following information on the outside: Sealed Bid for the: Strode Station Elementary School - Gym Floor Replacement No proposal shall be withdrawn for a period of sixty (60) days after the date of bid opening. The last date for the Architect to receive items to be addressed in any addenda is February 7, 2023 by 12:00 p.m. EST. All requests must be submitted to the Architect in writing. Method of Receiving Bids: Bids will be received from Contractors for a Total Lump Sum Amount. All phases of the work shall be bid to and through the Contractor submitting the proposal. Bid Security in the amount of five (5) percent of each proposal submitted must accompany each Proposal in accordance with the Form of Proposal. It is the Owner's intent to purchase significant quantities of materials through direct purchase orders. After review of bids, the Owner will issue purchase orders for major material items. Refer to the Supplemental Instructions to Bidders, General Conditions, Supplementary Conditions, additional bidding documentation and Division 1 sections for additional information. Right to Reject and Waiver: The Owner reserves the right to accept any bid, to reject any or all bids, to waive any informalities in bids received where such acceptance, rejection, or waiver is considered to be in the best interest of the Owner or to reject any bid where evidence or information submitted by the bidder does not satisfy the Owner that the bidder is qualified to carry out the details of the Contract Documents. The Owner's desire to waive irregularities and informalities as to a bid shall be reviewed and final judgement made by the Kentucky Department of Education, Division of Facilities Management, prior to approval of the contract and financing plan. General Information: Federal Wage Rates are not applicable. State Wage Rates are not applicable. Conflicts of interest, gratuities and kickbacks are defined in KRS 45A.445 and as provided for in KRS 45A.455 are absolutely prohibited. Preference for resident bidders shall be given as outlined in KRS 45A.90 to 45A.94. The successful bidder must supply a 100% Performance and Payment Bond as outlined in the Project Manual.

Post-Bid

Educational

$200,000.00

Public - County

Renovation

4

8

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Subflooring, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding
Division 09 - Finishes

Division 09 - Finishes

Flooring, Wood Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Special Foundations
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
26
Bidding Soon
447
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

March 17, 2023

img_map_placeholder

1750 Martin Luther King Jr Dr, Winchester, KY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Strode Station Elementary School - Gym Floor Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.