BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for an educational facility in Bethany, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Okaw Valley CUSD 302 is seeking qualified bids for asbestos abatement work at the Okaw Valley High School in Bethany and the Middle School in Findlay, Illinois. The work precedes the Okaw Valley 2023 Summer Improvements, which bids under aseparate contract. Bidders shall confirm with the District Office the Superintendent's address before submitting Bids. Bids shall be enclosed in a sealed envelope endorsed "ATTN: Asbestos Abatement Work for Okaw Valley 2023 Summer Improvements. The work includes the removal of +/- 2,500 square feet (SF) of floor tile and mastic at the High School and about 1,800 SF of the same at the Middle School. The Middle School also includes the removal of a small amount of pipe and pipe fitting insulation. Work may begin between May 18th and May 25th, 2023, depending on the number of emergency days used. The Asbestos Abatement Contractor will be under contract with the District, and be paid by same. Not less than the prevailing hourly wage, as determined by the Illinois Department of Labor for Moultrie and Shelby Counties, shall be paid for any part of the work. Bid bonds are not required and bidders shall not discriminate against any employee or applicant for employment because of race, color, creed, or national origin. The successful Bidder shall furnish a Performance Bond and a Labor & Material Payment Bond each in an amount equal to 100% of the contract price. Bonds shall be filed with the School District prior to the successful contractor being issued a Notice to Proceed. The owner reserves the right to waive technicalities or to reject any or all bids. The awarded bid will be accepted under consideration of the School Board. Acceptance will be based on the lowest responsible bidder. The construction period will commence with the date of Notice of Award and shall be substantially complete within 30 consecutive calendar days thereafter. Contact Chonticha Bowman or Courtice Bowman at CourItice|Grason for additional questions.

Post-Bid

Educational

$300,000.00

Public - County

Asbestos Abatement, Site Work

4

8

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
42
Bidding Soon
502
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

March 13, 2023

img_map_placeholder

709 S St John St, Bethany, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.