Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Hinckley, Minnesota. Contact the soliciting agency for additional information.
The Mille Lacs Band of Ojibwe, Community Development office will be accepting sealed lump sum bids for a residential materials removal project located at 305 Fire Monument Rd, Hinckley, MN. There is not a mandatory pre-bid site visit. General Notes: It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the International Residential Code (IRC), and Mille Lacs Band of Ojibwe 2016 MLB Project Specification Book. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property. Contractor must reconnect all utilities, service panel or service feed. Also includes gas, propane. Include such equipment or materials identified in the pre-bid conference. Contractor will secure all permits and fees. Contractor is responsible for a thorough investigation of the scope of work. Contractor will repair any damage to the property or structure created by the scope of work. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND /OR MILLE LACS BAND BUILDING OFFICIAL. Work Scope Description: Contractor shall base his proposal on an approx. house size of 26'x36' with 2"x4" exterior walls. Contractor shall drop ceiling inside to provide removal and disposal of the vermiculite attic insulation materials identified in the provided lab test results. Contractor shall removal a section of exterior wall sheetrock to determine wall insulation type. If vermiculite, take a picture to send to the Owner. Abatement must include the collection and disposal of all vermiculite and contaminated materials and subsequent cleaning of contaminated areas as required by applicable law/ regulations. Contractor shall perform all collection, disposal and containment work in compliance with any and all applicable regulations, including MN Asbestos Abatement Act. Contractor/Subcontractor performing vermiculite removal must be licensed in accordance with Minnesota Department of Health (MDH) to perform asbestos-related work (ARW). Contractor shall provide air monitoring throughout removal and containment process. Contractor shall provide the owner with copies of the following: A. Contractor shall provide Owner with copies of all receipts/ log for landfill disposal. B. Air sampling data Contractor is responsible for securing all required permits and notifications as required by law/ regulation for vermiculite removal and disposal. All fees for such permits and notifications are the responsibility of the Contractor. Contractor/Subcontractor shall provide copies of all such permits and notifications to MLB Community Development. Bid Alternate #1: Provide lump sum added cost to provide removal and disposal of vermiculite insulation materials if they are also found in the house walls. Contractor shall provide Owner with photo comparison of vermiculite insulation in the walls to the attic insulation as proof of the need for additional materials removal. Contacts: Interested bidders shall contact either Carla Dunkley at 320-630-2495 or by email at carla.dunkley@millelacsband.com to be included on the bidder's list in the event that any addendums are issued for this project. Mobilization and Project Schedule: The Contractor shall be capable of mobilizing his equipment, crews, and subcontractors within 30 days of a fully executed contract. Project will be substantially complete within 60 days of fully executed contract. Contractor shall provide means and methods for all phases of removal, disposal and containment. COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS FOR ANY REASON. COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES Community development/project management reserves the right to reject any and all bids for any reason. Permits: Contractors are responsible to attain all necessary permits for all work, including Mille Lacs Band of Ojibwe (MLBO) and City of Hinckley Permits. Bonding Requirements: In accordance with Mille Lacs Band Title 7 as updated in Band Ordinance 07-22. Please note that bonding requirements on Mille Lacs Band Funded Residential projects has changed. Band Ordinance 07-22 states the following: For all Band funded residential construction projects, a performance bond is required for contracts in excess of $100,000.00.
Post-Bid
Residential Subdivision
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 25, 2023
February 27, 2023
305 Fire Monument Rd, Hinckley, MN
Related To This Project
Hinckley, MN
Bid Date: May 24 2023
Hinckley, MN
Bid Date: Jun 14 2023
Hinckley, MN
--
Hinckley, MN
Bid Date: Aug 09 2023
Hinckley, MN
Bid Date: Aug 09 2023
Hinckley, MN
Bid Date: Feb 09 2022
Hinckley, MN
Bid Date: Jun 15 2022
Hinckley, MN
Bid Date: Jan 31 2023
Hinckley, MN
Bid Date: Sep 28 2022
Hinckley, MN
Bid Date: Sep 07 2022
Hinckley, MN
Bid Date: Sep 07 2022
Hinckley, MN
Bid Date: Sep 07 2022
Hinckley, MN
Bid Date: Sep 07 2022
Hinckley, MN
Bid Date: Jun 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.