BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Santa Cruz, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

For Crosswalk Upgrade Project The estimated cost of the project is $159,863.65 This project involves the upgrading existing crosswalks to current standards. Major work includes, but is not limited to construction of rapid flashing beacons, curb ramps, pavement markings and striping, signing and pavement replacement. The successful bidder shall furnish a payment bond and a performance bond. The Contractor shall possess a Class A license at the time that this contract is awarded. The Department of Community Development and Infrastructure hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Bidders are advised that, as required by federal law, the County of Santa Cruz is implementing new Disadvantaged Business Enterprise requirements for Disadvantaged Business Enterprises (DBE). The DBE Contract Goal is 17 percent. In addition, bidders shall provide documentation showing that adequate good faith efforts were made to meet the goal as required in the Special Provisions. Attention is directed to the Federal minimum wage rate requirements in the Proposal and the State general prevailing wage rate requirements in the Special Provisions. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. Question Submission Deadline:February 3, 2023, 5:00pm

Award

Sidewalks / Parking Lot

$374,388.00

Public - County

Paving, Site Work

10

11

2

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
115
Bidding Soon
2,257
All Active Projects
935
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 9, 2023

March 13, 2023

May 8, 2023

img_map_placeholder

Multiple Locations, Santa Cruz, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.