EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 2, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Grundy Center, Iowa. Completed plans call for the renovation of a educational facility.

Construction for Elementary School Improvements Project and a Secondary School Improvements Project. Work includes site development, civil, architectural, structural, mechanical, electrical, and technology systems. The existing school building renovation will include demolition, concrete slab on grade, masonry, general construction, storefront/curtain wall window systems, aluminum entrances, metal stud framing, drywall walls & ceilings, flooring, acoustical ceilings tile, painting, specialties, fire suppression, plumbing, HVAC, Electrical, Communications, Technology, and Security. Listing of Bid Packages Elementary Project Only: Bid Package 01-A: Asbestos Abatement – NA – (Secondary Bldg. Project Only) Bid Package 02-A: Sitework & Site Utilities - NA – (Secondary Bldg. Project Only) Bid Package 03-A: Landscaping & Seeding - NA – (Secondary Bldg. Project Only) Bid Package 04-A: Site Pavement - NA – (Secondary Bldg. Project Only) Bid Package 05-A: Concrete Foundations & Floors – Scope of Work Moved to BP #09-A Bid Package 06-A: Structural Steel & Erection – Scope of Work Moved to BP #09-A Bid Package 07-A: Masonry – Scope of Work Moved to BP #09-A Bid Package 08-A: Roofing & Sheet Metal – NA – (Secondary Bldg. Project Only) Bid Package 09-A: General Construction - $520,879 Bid Package 10-A: Aluminum Storefront, Glass, & Glazing – Scope of Work Moved to BP #09-A Bid Package 11-A: Studs, Drywall, Insulation, & EIFS – Scope of Work Moved to BP #09-A Bid Package 12-A: Painting – Scope of Work Moved to BP #09-A Bid Package 13-A: Acoustical/Special Ceilings & Panels – Scope of Work Moved to BP #09-A Bid Package 14-A: Flooring & Tiling - $75,776 Bid Package 15-A: Plumbing & HVAC (Includes Fire Suppression) - $602,313 Bid Package 16-A: Electrical, Communications, and Technology - $240,188 AND Listing of Bid Packages Secondary Project Only: Bid Package 01-B: Asbestos Abatement - $84,054 Bid Package 02-B: Sitework & Site Utilities – (Secondary Bldg. Project Only) - $221,175 Bid Package 03-B: Landscaping & Seeding – (Secondary Bldg. Project Only) - $45,892 Bid Package 04-B: Site Pavement – (Secondary Bldg. Project Only) - $113,424 Bid Package 05-B: Concrete Foundations & Floors - $202,447 Bid Package 06-B: Structural Steel, Erection – (Secondary Bldg. Project Only) - $206,720 Bid Package 07-B: Masonry - 175,947 Bid Package 08-B: Roofing & Sheetmetal – (Secondary Bldg. Project Only) - 497,581 Bid Package 09-B: General Construction - $962,802 Bid Package 10-B: Aluminum Storefront, Glass, & Glazing - $249,149 Bid Package 11-B: Studs, Drywall, Insulation, & EIFS - $322,255 Bid Package 12-B: Painting - $66,736 Bid Package 13-B: Acoustical & Special Ceilings & Panels - $190,016 Bid Package 14-B: Flooring & Tiling - $160,821 Bid Package 15-B: Plumbing & HVAC - $2,372,955 Bid Package 16-B: Electrical, Communications, and Technology - $958955 Elementary School Cost Value $1,439,156 Secondary School Cost Value $6,830,928 The bids will be presented to and considered by the School Board for Grundy Center Community School District at 5:00 PM March 1, 2023 in the School Board Conference Room at the Grundy Center Community School District Administration Office located at 1301 12th Street, Grundy Center, IA 50638, and such proposals received will be acted upon at such time and place or at such later time and place as may then be fixed. Owner will issue an authorization letter and tax exemption certificate to the contractor and/or subcontractors for the purchase or use of building materials, supplies, and equipment to be used on this project only. DO NOT INCLUDE SALES TAX ON YOUR BID FORM. No bid may be withdrawn for a period of 60 calendar days after the date of the scheduled closing time for the receipt of bids. All bids shall be accompanied by a bid security in a separate sealed envelope as allowed by Section 26.14A of the Iowa Code. Bid security in the amount of 5% of the total bid in the form of certified check, credit union share draft, or surety bond written on an original AIA Document A310, Bid Bond is required for this project. The successful bidder will be required to provide surety Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the Contract Sum. The surety providing bonds must have an (A-) A.M. Best rating or better or be listed on the U.S. Department of Treasury listing of approved sureties (Department Circular 570). The cost of the Bonds shall be included in the Contract Sum Notice of Award will be issued within 60 days of the receipt of the bids. Construction Period: Approximately 4 MONTHS for Elementary project only. Both Secondary and Elementary projects will be approximately 17 MONTHS. The Grundy Center Community School District School Board reserves the right to reject any and all bids, to waive informalities and technicalities, and to enter such contracts as it deems in the best interest of the School District

Post-Bid

Educational

$6,830,928.00

Public - City

Renovation

239

49

71

6

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Vehicular Access and Parking, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Membrane Roofing, Elastomeric Membrane Roofing, Flashing and Sheet Metal, Flexible Flashing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Resilient Athletic Flooring, Terrazzo Flooring, Carpeting, Tile Carpeting, Wall Finishes, Special Wall Surfacing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Plastic Toilet Compartments, Cubicle Curtains, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers, Flagpoles
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Convectors, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Electrical Utilities, Utility Substations
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
27
Bidding Soon
681
All Active Projects
261
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

May 24, 2023

img_map_placeholder

903 9th St, Grundy Center, IA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Construction for Elementary School Improvements Project and a Secondary School Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.