BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Grundy Center, Iowa. Completed plans call for the renovation of a educational facility.

Construction for Elementary School Improvements Project and a Secondary School Improvements Project. Work includes site development, civil, architectural, structural, mechanical, electrical, and technology systems. The existing school building renovation will include demolition, concrete slab on grade, masonry, general construction, storefront/curtain wall window systems, aluminum entrances, metal stud framing, drywall walls & ceilings, flooring, acoustical ceilings tile, painting, specialties, fire suppression, plumbing, HVAC, Electrical, Communications, Technology, and Security. Listing of Bid Packages Elementary Project Only: Bid Package 01-A: Asbestos Abatement – NA – (Secondary Bldg. Project Only) Bid Package 02-A: Sitework & Site Utilities - NA – (Secondary Bldg. Project Only) Bid Package 03-A: Landscaping & Seeding - NA – (Secondary Bldg. Project Only) Bid Package 04-A: Site Pavement - NA – (Secondary Bldg. Project Only) Bid Package 05-A: Concrete Foundations & Floors – Scope of Work Moved to BP #09-A Bid Package 06-A: Structural Steel & Erection – Scope of Work Moved to BP #09-A Bid Package 07-A: Masonry – Scope of Work Moved to BP #09-A Bid Package 08-A: Roofing & Sheet Metal – NA – (Secondary Bldg. Project Only) Bid Package 09-A: General Construction - $520,879 Bid Package 10-A: Aluminum Storefront, Glass, & Glazing – Scope of Work Moved to BP #09-A Bid Package 11-A: Studs, Drywall, Insulation, & EIFS – Scope of Work Moved to BP #09-A Bid Package 12-A: Painting – Scope of Work Moved to BP #09-A Bid Package 13-A: Acoustical/Special Ceilings & Panels – Scope of Work Moved to BP #09-A Bid Package 14-A: Flooring & Tiling - $75,776 Bid Package 15-A: Plumbing & HVAC (Includes Fire Suppression) - $602,313 Bid Package 16-A: Electrical, Communications, and Technology - $240,188 AND Listing of Bid Packages Secondary Project Only: Bid Package 01-B: Asbestos Abatement - $84,054 Bid Package 02-B: Sitework & Site Utilities – (Secondary Bldg. Project Only) - $221,175 Bid Package 03-B: Landscaping & Seeding – (Secondary Bldg. Project Only) - $45,892 Bid Package 04-B: Site Pavement – (Secondary Bldg. Project Only) - $113,424 Bid Package 05-B: Concrete Foundations & Floors - $202,447 Bid Package 06-B: Structural Steel, Erection – (Secondary Bldg. Project Only) - $206,720 Bid Package 07-B: Masonry - 175,947 Bid Package 08-B: Roofing & Sheetmetal – (Secondary Bldg. Project Only) - 497,581 Bid Package 09-B: General Construction - $962,802 Bid Package 10-B: Aluminum Storefront, Glass, & Glazing - $249,149 Bid Package 11-B: Studs, Drywall, Insulation, & EIFS - $322,255 Bid Package 12-B: Painting - $66,736 Bid Package 13-B: Acoustical & Special Ceilings & Panels - $190,016 Bid Package 14-B: Flooring & Tiling - $160,821 Bid Package 15-B: Plumbing & HVAC - $2,372,955 Bid Package 16-B: Electrical, Communications, and Technology - $958955 Elementary School Cost Value $1,439,156 Secondary School Cost Value $6,830,928 The bids will be presented to and considered by the School Board for Grundy Center Community School District at 5:00 PM March 1, 2023 in the School Board Conference Room at the Grundy Center Community School District Administration Office located at 1301 12th Street, Grundy Center, IA 50638, and such proposals received will be acted upon at such time and place or at such later time and place as may then be fixed. Owner will issue an authorization letter and tax exemption certificate to the contractor and/or subcontractors for the purchase or use of building materials, supplies, and equipment to be used on this project only. DO NOT INCLUDE SALES TAX ON YOUR BID FORM. No bid may be withdrawn for a period of 60 calendar days after the date of the scheduled closing time for the receipt of bids. All bids shall be accompanied by a bid security in a separate sealed envelope as allowed by Section 26.14A of the Iowa Code. Bid security in the amount of 5% of the total bid in the form of certified check, credit union share draft, or surety bond written on an original AIA Document A310, Bid Bond is required for this project. The successful bidder will be required to provide surety Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the Contract Sum. The surety providing bonds must have an (A-) A.M. Best rating or better or be listed on the U.S. Department of Treasury listing of approved sureties (Department Circular 570). The cost of the Bonds shall be included in the Contract Sum Notice of Award will be issued within 60 days of the receipt of the bids. Construction Period: Approximately 4 MONTHS for Elementary project only. Both Secondary and Elementary projects will be approximately 17 MONTHS. The Grundy Center Community School District School Board reserves the right to reject any and all bids, to waive informalities and technicalities, and to enter such contracts as it deems in the best interest of the School District

Post-Bid

Educational

$6,830,928.00

Public - City

Renovation

239

49

71

6

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
63
Bidding Soon
1,209
All Active Projects
435
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 1, 2023

May 24, 2023

July 21, 2023

img_map_placeholder

903 9th St, Grundy Center, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.