BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Berry, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work for which bids are asked includes the following: 250 LF of town road reconstruction for a stormwater structure replacement including clearing and grubbing, sawcut asphalt, removing asphalt surface, removing existing structure, 49.5 LF of 15'- 4" x 6'-5" aluminum box culvert with headwalls and wingwalls, structure backfill, base aggregate, asphalt pavement, traffic control, medium riprap, geotextile fabric, fence removal and replacement, salvaged topsoil, erosion control, and final restoration. The contractor shall have 25 calendar days for substantial completion, and an additional 5 calendar days for final completion once the contractor starts work. All work must be completed by October 20, 2023 regardless of the start date. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1230 South Boulevard, Baraboo, WI 53913The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Town of Berry.

Award

Roads / Highways

$148,016.00

Public - City

Paving, Site Work

8

17

2

9

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
91
Bidding Soon
1,052
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

March 20, 2023

Project location map

Spring Valley Rd, Berry, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.