BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and renovation of a mixed-use development in Rock Falls, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for the renovation of a playground / park / athletic field.

VALHALLA RECERATION AREA TRAIL REALIGNMENT AND SITE IMPROVEMENTS THE SCOPE OF WORK INCLUDES CLEARING AND GRUBBING, INSTALLATION OF NEW CULVERTS, AGGREGATE SURFACE AND SHOULDERS FOR ROADWAYS AND PARKING AREAS, ATV/SNOWMOBILE TRAIL, FENCING, BONFIRE PIT, ROOF SNOW GUARDS, AGGREGATE SURFACE PATIO, SIGNAGE, KIOSKS, REMOVAL OF A LIGHT AND POLE, ELECTRICAL CONDUIT ABANDONMENT, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. WANOKA CAMPGROUND ROAD RECONDITIONING AND REPAVING THE SCOPE OF WORK INCLUDES REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF NEW CULVERTS, ASPHALT PAVEMENT REMOVAL, ASPHALT PAVEMENT, RECONDITIONING OF DITCHES, SHOULDERS, AND AGGREGATE SURFACE, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RELOCATING A VAULT TOILET TO THE CAMPGROUND AND RELATED CLEARING AND GRUBBING. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR CONSTRUCTION OF AN OVERFLOW PARKING AREA AND RELATED CLEARING AND GRUBBING. WANOKA CAMPGROUND IMPROVEMENTS (OBI) THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE AND A WASTEWATER HOLDING TANK AT HOST SITE NUMBER 4. PICNIC POINT CAMPGROUND ROAD RECONDITIONING AND REPAVING THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF A NEW CULVERT, PAVEMENT REMOVAL AND REPLACEMENT, SIGNAGE REMOVAL AND REPLACEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RECONSTRUCTION OF THE BOAT RAMP. PICNIC POINT CAMPGROUND VAULT TOILET REPLACEMENT (OBI) SCOPE OF WORK INCLUDES REMOVING 1 SINGLE-USER VAULT TOILET FROM SITE AND ISNTALLING 1 CXT DOUBLE CASCADIAN (OR EQUIVALENT) DOUBLE VAULT TOILET IN THE FOOTPRINT OF THE REMOVED STRUCTURE. LUNA-WHITE DEER CAMPGROUD ROAD RECONDITIONING AND REPAVING THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPES, INSTALLATION OF A NEW CULVERTS, PAVEMENT FULL DEPTH RECLAMATION AND ASPHALT PAVEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. Project Magnatude is estimayed between $1M and $2M. This project is a total small business set-aside under NAICS code 237310, size standard $40.5M . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$2,000,000.00

Public - Federal

Outdoor Lighting, Paving, Renovation, Site Work

98

20

39

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
19
Bidding Soon
664
All Active Projects
152
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 20, 2023

June 15, 2023

August 1, 2024

img_map_placeholder

Multiple Locations, Rock Falls, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.