BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a stadium in Daly City, California. Completed plans call for the renovation of a stadium.

the following public works project: Public Safety Power Shutdown (PSPS) Cow Palace Arena & Event Center Engineers Estimate: $420,000.00 The project consists of all labor, equipment, and incidental materials to install PSPS equipment to backup three areas at the facility. The Bidder is required to possess a California Contractors C-10 License that is active and in good standing at the time of the bid opening and throughout the duration of Contract. 1. Full project details are included on the project plans included in Appendix B (See Appendix B - Construction Plans), and summarized below: North Hall Main existing panel is fed by a 400A,120/208V,3Ø,4W feeder. Install new 400A ATS at North Hall with the generator docking station located on the west exterior wall of the north building. Integrate ATS and docking station into the existing hall main panel using new conductors/conduit and appropriate connections. Move existing heater circuits from existing 100A panel to existing main panel. South Hall Main existing panel is fed by a 400A,120/208V,3Ø,4W feeder. Install new 400A ATS at South Hall with generator docking station located on the west exterior wall of the South Hall building. Integrate ATS and docking station into the existing hall main panel using new conductors/conduit and appropriate connections. Move existing heater circuits from existing 100A panel to existing main panel. The Roundup Room The Round Room has Qty (4) different panels with (4) different feeders providing power to different locations within the restaurant Mount a new ATS and fused disconnect on the wall of the South Hall for each panel. Add an 800A feed from docking station, feeding fused disconnect for each one. Panel BK has a 225A 3Ph 4-Wire service. Intercept the existing feeder in Tee Bar Ceiling. Route new conduit wire for line load to new ATS in South Hall. This will be the same on Blank panel (called "BL"), which is 150A 120/208 3Ph 4- Wire. This will be the same for Panel RP which is 200A 120/208 3PH 4-Wire. This will be the same for Panel M which is 100A 120/208 3PH 4-Wire.

Award

Arenas / Stadiums

$396,962.00

Public - State/Provincial

Renovation

8

9

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
79
Bidding Soon
1,786
All Active Projects
741
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

February 22, 2023

img_map_placeholder

2600 Geneva Ave, Daly City, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.