BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Valley View, Ohio. Completed plans call for the renovation of a water / sewer project.

This project will replace obsolete programmable logic controllers (PLCs) currently in operation at the Renewable Energy Facility (REF) located at Southerly WWTC and will provide consistency in the programming of the new equipment. The improvements and services provided by this project will improve control system equipment, data collection, and the documentation and maintainability of the control system to enhance overall system functionality and reliability. WBE/MBE Goal: 17% SBE Goal: 3% REF PLC Replacement (1656) Questions regarding this RFP shall be directed to Robin Rupe or Christine Umerley at the pre-proposal meeting or at other times by e-mailing to ruper@neorsd.org and umerleyc@neorsd.org. This project involves the replacement of PLCs, whose product lifecycle statuses warrants replacement, in the REF and biofilter building at Southerly WWTC. During the Master Plan, a PLC inventory list was created for each plant. Revisions and updates have been made to this list based on hardware inventory assessments performed by Rockwell Automation and NEORSD staff. A detailed summary of the most recent information is presented in Appendix A and B of this RFP. Initial P&IDs for each of these PLCs is included in Appendix D and E. This information is provided for reference purposes only as actual conditions may vary. To obtain maximum advantage to replacing the PLCs, the approach to replacement should not just focus on hardware swaps. The overall replacement project should include the following major goals: ControlLogix PLCs that are L6 series, as shown in the table below and in Appendix A and B, will be required to be replaced with L8 series, at a minimum. These changes will be included in the bid documents developed for replacement of the aging PLCs. QA Date 15/2/2023 4.30pm I recently received a request for updated information about the REF PLC Replacement project. This project is not in the bidding phase, but is currently procuring for design, with the due date for responses to the RFP having been on March 3, 2023. We anticipate requesting our Board to award for design sometime in May.

Post-Bid

Water / Sewer

$10,000,000.00

Public - State/Provincial

Renovation

622

4

5

2

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
63
Bidding Soon
991
All Active Projects
387
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

June 5, 2023

img_map_placeholder

6000 Canal Rd, Valley View, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.