BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Coos Bay, Oregon. Completed plans call for site work for a transportation facility.

This Project consists of replacing approximately 48,000 ties, surfacing of approximately 85 miles of track and placing approximately 48,000 tons of ballast. The Contractor will be required to perform the following scopes as more fully described in the Contract Drawings and Special Provisions Notification of Intent to Award March 22, 2023 Anticipated Award Date April 05, 2023 Requests for Clarification/Solicitation Protest Due Date February 23, 2023, by 5:00 p.m This Project is funded by a combination of Port funds and Federal Grant funds. Project Work and contracting must be carried out in compliance with all U.S. Department of Transportation Maritime Administration funding requirements. The Port, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit Bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Bidders acknowledge and agree that, if awarded the Contract, no funds under the Contract may fund the use of any product or service of a foreign country during the period in which such foreign country is listed by the United States Trade Representative as denying fair and equitable market opportunities for products and suppliers of the United States in procurement and construction. Each Bid must be accompanied by Bid security made payable to Port in an amount of ten percent (10%) of Bidder's maximum Bid price and in the form of a cashier's check or certified check; irrevocable letter of credit issued by an insured institution as defined in ORS 706.008; or a Bid Bond as provided in the Contract Documents. The Successful Bidder, at its own expense, shall obtain and furnish to the Port a Performance Bond and a Payment Bond for the full amount of the Contract price, in a form acceptable to Port. Acceptable forms for the Payment and Performance Bonds are included as Exhibits to the Contract.

Award

Transportation Terminals

$1,544,250.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
105
All Active Projects
49
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

April 12, 2023

img_map_placeholder

Multiple Locations, Coos Bay, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.