BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Banks, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; transportation facility; and water / sewer project.

1.1 Installation of a 6-inch PVC water main from the cul-de-sac end of Wilkes Street to the exiting water main running parallel to the railroad tracks. Installation of connections to existing water system from the cul-de-sac to existing water main. 1.2 Installation of a 6-inch PVC water main connecting the existing inner water main loop along Woodman Alley from the intersection of Parmley Avenue and Woodman Alley to the exiting water main running parallel to the railroad tracks. Installation of connections to existing water system from Parmley Avenue to existing water main and testing and disinfection. 1.3 Replacement of existing service meters and meter boxes within Woodman Alley and Wilkes Street cul-de-sac with radio read meters. Work includes replacement of existing water service lines, associated laterals, valves, and curb stops along Woodman Alley and Wilkes St and testing and disinfection. 1.4 Removal and replacement of sidewalk and curb and gutter along north side of Wilkes Street. Install 2 Americans with Disability Act (ADA) compliant ramps: One set at Wilkes St and Main St and the second at the jog at Wilkes St to the cul-de-sac. Modification of 1 existing ADA ramp at Wilkes St & Park Ave. Remove and install pavement along Wilkes Street and intersection with NW Parmley Avenue and from intersection to Wilkes St cul-de-sac. Install crosswalk and parking striping. 1.5 Remove and replacement of pavement along Woodman Alley. 1.6 Removal and replacement of sidewalk and curb and gutter along Depot St. Install 2 Americans with ADA compliant ramp. Remove and replacement of pavement along Depot St. Install crosswalk and parking striping and associated signage. 1.7 Remove and replacement of pavement along the north portion of Woodman Ave from Main St to Parmley. 1.8 Remove and replacement of pavement along Parmley Ave between north portion of Woodman Ave and Wilkes Street. 1.9 Demolition and removal of existing curb, sidewalk, ramps, driveway, trees, shrubs, landscaping, and fencing, service laterals, fire hydrants, waterlines to accomplish scope of work. Work includes erosion control. 1.10 Bid Alternate A shall include: 1.10.1 Installation of a 6-inch PVC water main from Woodman Alley down Parmley Ave to Wilkes St. Installation of connections to existing water system from the cul-de-sac to existing water main. 1.10.2 Replacement of existing service meters and meter boxes within Wilkes St and Parmley Ave with radio read meters. Work includes replacement of existing water service lines, associated laterals, valves, and curb stops along Parmley Ave to Wilkes St and testing and disinfection. 1.10.3 Replacement of 2 fire hydrants with new hydrants equipped with Storz-type connections: one at the intersection of Wilkes St and Main St and the second along the jog at Wilkes Street to the cul-de-sac Questions. Regarding the type of work required may be addressed to Jose Cuevas, P.E. of Kennedy Jenks at: 421 SW 6th. Ave., Suite 1000 Portland, OR 97204 Direct: (606) 568-4325.

Bid Results

Roads / Highways

$705,525.00

Public - City

Paving, Site Work

54

12

33

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
65
Bidding Soon
1,137
All Active Projects
418
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

img_map_placeholder

NW Wilkes St, Banks, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.