EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Banks, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; transportation facility; and water / sewer project.

1.1 Installation of a 6-inch PVC water main from the cul-de-sac end of Wilkes Street to the exiting water main running parallel to the railroad tracks. Installation of connections to existing water system from the cul-de-sac to existing water main. 1.2 Installation of a 6-inch PVC water main connecting the existing inner water main loop along Woodman Alley from the intersection of Parmley Avenue and Woodman Alley to the exiting water main running parallel to the railroad tracks. Installation of connections to existing water system from Parmley Avenue to existing water main and testing and disinfection. 1.3 Replacement of existing service meters and meter boxes within Woodman Alley and Wilkes Street cul-de-sac with radio read meters. Work includes replacement of existing water service lines, associated laterals, valves, and curb stops along Woodman Alley and Wilkes St and testing and disinfection. 1.4 Removal and replacement of sidewalk and curb and gutter along north side of Wilkes Street. Install 2 Americans with Disability Act (ADA) compliant ramps: One set at Wilkes St and Main St and the second at the jog at Wilkes St to the cul-de-sac. Modification of 1 existing ADA ramp at Wilkes St & Park Ave. Remove and install pavement along Wilkes Street and intersection with NW Parmley Avenue and from intersection to Wilkes St cul-de-sac. Install crosswalk and parking striping. 1.5 Remove and replacement of pavement along Woodman Alley. 1.6 Removal and replacement of sidewalk and curb and gutter along Depot St. Install 2 Americans with ADA compliant ramp. Remove and replacement of pavement along Depot St. Install crosswalk and parking striping and associated signage. 1.7 Remove and replacement of pavement along the north portion of Woodman Ave from Main St to Parmley. 1.8 Remove and replacement of pavement along Parmley Ave between north portion of Woodman Ave and Wilkes Street. 1.9 Demolition and removal of existing curb, sidewalk, ramps, driveway, trees, shrubs, landscaping, and fencing, service laterals, fire hydrants, waterlines to accomplish scope of work. Work includes erosion control. 1.10 Bid Alternate A shall include: 1.10.1 Installation of a 6-inch PVC water main from Woodman Alley down Parmley Ave to Wilkes St. Installation of connections to existing water system from the cul-de-sac to existing water main. 1.10.2 Replacement of existing service meters and meter boxes within Wilkes St and Parmley Ave with radio read meters. Work includes replacement of existing water service lines, associated laterals, valves, and curb stops along Parmley Ave to Wilkes St and testing and disinfection. 1.10.3 Replacement of 2 fire hydrants with new hydrants equipped with Storz-type connections: one at the intersection of Wilkes St and Main St and the second along the jog at Wilkes Street to the cul-de-sac Questions. Regarding the type of work required may be addressed to Jose Cuevas, P.E. of Kennedy Jenks at: 421 SW 6th. Ave., Suite 1000 Portland, OR 97204 Direct: (606) 568-4325.

Bid Results

Roads / Highways

$705,525.00

Public - City

Paving, Site Work

54

12

33

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Service Connections, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
38
Bidding Soon
758
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

img_map_placeholder

NW Wilkes St, Banks, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.