BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Eielson AFB, Alaska. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The second site visit has been postponed until after SOW changes are made as a result of questions previously submitted. An update will be posted when a new date is decided upon and a SOW with updates is added to the solicitation. If you have any questions please contact SSgt Kouba. The purpose of this project is to design and install a secondary wet well lift station to support an existing wet well in another building in case of overflow so a secondary system can pull stress away from the primary system. This system will specifically be used to support the main sewage system and wet well LS-11A. In accordance with Federal Acquisition Regulation (FAR) 36.204, Disclosure of the Magnitude of Construction Projects, the anticipated price is from $1,000,000 to $5,000,000. The anticipated North American Industry Classification System (NACIS) code is 236220, with a size standard of $45M. The Government is contemplating a Firm Fixed Price (FFP) contract. A. NAICS Code 236220 / Size Standard $45 Million B. The resulting contract will be a firm fixed price contract. See Section J for applicable attachments If there are any questions in regards to this amendment please contact SSgt Alexander Kouba, alexander.kouba@us.af.mil. C. The magnitude for this requirement IAW FAR 36.204(e), is between $1,000,000 and $5,000,000 D. Payment and Performance bonds shall be obtained IAW FAR 28.102 E. This acquisition is being designated for procurement as a Total Small Business Set-Aside F. A site visit will be conducted with the end user, contractor, CE, and CONS for 4 May 2023 at 2:30 PM AKST Participants will meet at- Bldg 2310 Central Ave, Eielson AFB Alaska 99702 Each prime contractor is allowed to bring two personnel. If you are attending contact Alexander Kouba at alexander.kouba@us.af.mil AND Cristopher Pennock at cristopher.pennock@us.af.mil with the name(s) of the individual(s) who are planning on attending by 10:00 AM AKST on 2 May 2023 - No questions will be taken over the phone G. All questions related to this solicitation and/or related to the SOW should be submitted by 2:00 pm AKST on 12 May 2023 to Alexander Kouba at alexander.kouba@us.af.mil and Cristopher Pennock at cristopher.pennock@us.af.mil. They will then be consolidated and posted to SAM.gov along with the Government responses. H. Refer to Attachment 6. Section L for proposal submission requirements I. The Period of Performance is 365 Calendar Days after Notice to Proceed (NTP) Amendment 2: This amendment is to extend the solicitation by 2 weeks due to time frame for questions getting answered by CE. This will give time for responses and allow for a second site visit to occur on June 13th, 2023 at 1000 hrs. This will be occuring at the Lift Station for those interested. If you don't have access to attend please contact SSgt Alexander Kouba at alexander.kouba@us.af.mil. If there are any questions please contact SSgt Kouba at the above email. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Statement of Work (SOW) is to provide the general scope of work to be performed on Eielson Air Force Base (AFB), Alaska. The purpose of this project is to design and build a secondary wet-well lift station to be utilized for bypass purposes. This wet-well will be installed adjacent to the facility that houses the existing LS11A. The new lift station will be sized to meet anticipated peak demand and shall include all required piping, valves, controls, fittings, mechanical and electrical connections to design and build a new fully functional system. The SOW describes the Government's requirement for the design and construction that shall include connection of electrical circuits for new controls to the existing LS-11A's generator to ensure uninterrupted operation and connection of new pipes, valves, fittings, controls, etc. to new lift station and place into service, coordinating shutdowns as appropriate. The current wet well is estimated to hold between 2000-3000 gallons and the current pumps are rated for 900 GPM. The new pumps need to be sized accordingly to fit the issues is the pumps short cycling. Currently, the lead pump calls on at around 35-40% and only runs for about 30 seconds max before disengaging. The new pumps shall the pumps run for around 2 minutes each time they call on for the sake of service life of the equipment. Peak influent flow is roughly 500 GPM. The current 900 GPM pumps were selected for that application. The determination for sizing the pumps in the secondary well will depend on designed dimensions of the new basin and the desired run time of the pumps. The Contractor shall provide a design and construction in accordance with (IAW) Unified Facility Code (UFC) 3- 201-01 Civil Engineering and UFC 3-240-01 Wastewater Collection and Treatment) and this SOW. Construction activities shall not commence until the design has been completed and accepted by the Government.

Post-Bid

Water / Sewer

$5,000,000.00

Public - Federal

Renovation, Site Work

18

36

18

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
11
All Active Projects
2
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

September 11, 2023

img_map_placeholder

2310 Central Ave, Eielson AFB, AK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.