BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; and water / sewer project.

PRK730308-06 PRK730306-14. PN-SUSIP0000060 As of April 19, 2023, all bids for this project have been rejected. At this time, it has not been confirmed if the project will be rebid. Installation and maintenance of temporary erosion and sedimentation controls; tree, vegetation and soil protection in right of way; construction stormwater controls; removal of concrete rubble, trees, vegetation and soil and loading onto trucks provided by another contractor, hauling and disposing of onsite soil is by others; placement of geotextile and membrane root barrier; import and placement of fill soil and planting soil, construction of new curbs and curb ramps, asphalt roadway, concrete pathways, synthetic turf and rubberized poured in place surfacing, asphalt play court, adult fitness equipment, children's play equipment, basketball hoop, site furnishings including benches, tables, barbeques, and trash receptacles; electrical connection and lighting; stormwater drainage, including bioretention; water service and drinking fountain, sewer connection, irrigation system installation; trees shrubs and groundcover planting, and tree root barriers. Additive #1: Water Service to Drinking Fountain and stub-out for future Portland Loo; Side Sewer Connection to Drinking Fountain location and cleanout and stub-out for future Portland Loo. Additive #2 Water Meter, Drinking Fountain and water/sewer connections to Drinking Fountain. Additive #3 Portland Loo Install. Additive # 4 Picnic area If the successful Contractor fails to complete Work within the time set forth, Contractor shall be charged Liquidated Damages per Section 4 of the 00 52 00 Agreement Form. Deadline for Contractor questions regarding this Department of Parks and Recreation project shall be submitted by close of business on February 21st, 2023, to the Parks and Recreation project manager via mike.schwindeller@seattle.gov Clarification Deadline: 6/7/2023 4:30 PM Project # PRK730308-06, PRK730306-14 The site is located at 3656 34th Ave South, in Seattle, Washington. Substantially Complete within 150 working days of the Notice to Proceed and Physically Complete within 165 working days of the Notice to Proceed A/E ESTIMATE: $2,296,469 Additive #1 $8,370, Additive #2 $31,533, Additive #3 $21, 445 Deadline for Contractor questions regarding this Parks and Recreation project shall be submitted by close of business on Wednesday, June 7th, 2023, to the Parks project manager via Jonathan.Pagan@seattle.gov

Bid Results

Playgrounds / Parks / Athletic Fields

$2,789,000.00

Public - City

Paving, Site Work

51

25

35

2

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
113
Bidding Soon
1,769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2023

August 14, 2023

Project location map

3656 34th Ave S, Seattle, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.