BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and addition to an elderly care / assisted living facility in Moreno Valley, California. Completed plans call for the addition of a elderly care / assisted living facility; for the demolition of a elderly care / assisted living facility; and for site work for a elderly care / assisted living facility.

Project no - 23-224, 30-23-01, 2023-40129, 2314 This project will expand the existing senior center by adding approximately 4,000 square feet of building space allowing the center to serve the growing number of senior citizens with additional programs, classes, events, and social activities. The project will upgrade existing restrooms and other facilities to current ADA standards. Modifications to the existing parking lot and landscape areas to accommodate the expansion may be included, as necessary. The work includes, but is not limited to: demolition, clearing and grubbing, mass/over-excavation as required by the Geotechnical Investigation and as noted on the Contract Drawings; compaction, foundation footings, erection/aligning and welding of structural steel, construction of CMU walls, slab on grade; rough and finish plumbing; rough and finish electrical; rough and finish mechanical; exterior cladding; exterior and interior glazing; fire sprinklers and fire suppression systems; doors and hardware; gypsum board walls; miscellaneous metals; painting; flooring; toilet partitions; excavation, conduit, site utilities that include domestic water, fire water, sewer, telephone, cable, gas connections and other related utilities and connections; irrigation and landscaping, site hardscape; recycling of materials; preparation of redline as-built drawings; O&M manuals and other related work described in the Special Provisions including all parts of the Technical Provisions, Detailed Provisions and as shown and required in the Contract Documents to achieve Final Completion. Bid Value: $3,700,000 90-122, 30-23-01, 23-224 Question Submission Deadline August 22, 2024, 2:00pm

Award

Elderly Care / Assisted Living

$4,990,000.00

Public - City

Addition, Demolition, Site Work

248

44

131

4

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
101
Bidding Soon
2,241
All Active Projects
1,011
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

October 29, 2024

img_map_placeholder

25075 Fir Ave, Moreno Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.