BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Riverside, California. Completed plans call for site work for a water / sewer project.

As of December 15, 2023, the project has not been awarded. A timeline for award has not been confirmed. The Magnolia Avenue Sewer Force Main Rehabilitation project proposes to repair and rehabilitate approximately 9,845 L.F. of an existing 24-inch Cement-Mortar Lined & Coated (CML&C) steel pipe with Flexible Fabric Reinforced Pipe (FFRP) method via downstream inversion and closures at access pits on Magnolia Avenue. The project also includes cleaning and closed-circuit television (CCTV) inspection of the pipelines before and after the lining process, as well as all associated work necessary for a fully functional force main. The Contractor shall be responsible for maintaining public health, safety, control of odor and noise, and repair and reconstruction of improvements affected by the Work to the existing condition or better for a complete and usable force main system. The 24-inch CML&C is currently not in operation. The City of Riverside Public Utilities Department has determined bidders shall hold a valid Class "A -General Engineering Contractor" or "C-34 Pipeline Contractor" State of California Contractor's license in good standing. Proposal Guaranty in the form of a Cashier's check or Certified check must be submitted to the Purchasing Manager, at 3900 Main Street, Riverside, CA 92522, prior to the hour and the date stated above. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 11/14/2023 2:00 PM (PST) Online Questions Responses: November 21, 2023, Before 2:00 P.M. PT Pre-Bid Meeting No Start/Delivery Date - The contract time shall commence on the date specified in the Notice to Proceed. Project Duration - The Contractor shall complete the work within one-hundred twenty (120) working days after the commencement date specified in the Notice to Proceed. The Purchasing Manager reserves the right to waive any irregularities or informalities. The City Council reserves the right to reject any or all bids.

Bid Results

Water / Sewer

$6,885,400.00

Public - City

Site Work

24

11

7

6

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
105
Bidding Soon
2,277
All Active Projects
1,023
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2023

February 5, 2024

img_map_placeholder

Magnolia Ave, Riverside, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.