BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 1, 2024 at 8:00 PM

Updated November 2, 2024

Site work, paving and outdoor lighting for a civil project in Wildwood, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and for outdoor lighting for a road / highway.

*Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. DESCRIPTION OF WORK: All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by the Engineer. Bids shall be submitted for furnishing, delivering, and installing all materials, equipment, and services, including labor for the Work, which generally involves the following activities: Rehabilitation of Jackson Street from Kilgore Street to West Clark Street via full depth reclamation. Utility improvements are also included within the project, including installation of approximately 3,500 linear feet (LF) of 8-inch PVC water main, reconnection of existing services and water meters, and abandonment of 3,500 LF of 2-inch water main. Moreover, lighting improvements are also included within this project that require coordination with Duke Energy CONTRACT TIME: Construction time to achieve Substantial Completion is 90 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion. Total construction duration is 120 consecutive calendar days. PERFORMANCE AND PAYMENT BOND: The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price

Bid Results

Roads / Highways

$1,533,916.00

Public - City

Outdoor Lighting, Paving, Site Work

43

10

18

4

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
176
Bidding Soon
2,555
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

December 23, 2024

Project location map

Jackson St, Wildwood, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.