BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Eau Claire, Wisconsin. Completed plans call for the renovation of a clubhouse / community center.

**As of April 8,2024 has not yet been awarded. A timeline for the award has not yet been established.** Eau Claire County is requesting bids for improvements of the Eau Claire Clubhouse located at E19230 County Road SD, Augusta WI 54722, as specified in this bid. The county will award a single contractor which will manage all subcontractors Bid Opening. Tap to join from a mobile device (attendees only) +1-415-655-0001,,25311542270## US Toll Join by phone +1-415-655-0001 US Toll The contractor shall give notice to the County 10 days prior to the start of the work. The contractor is responsible for completing the project expeditiously. Deadline for Questions - February 29, 2024, 1:00 PM CST Award - March 2024 Project Begins - Flexible, prefer to start project as soon possible. Completion date - Continuous work once on job, but no later than 7/15/2024 Bid Bond/Performance Bond - Approval of Payment A bid bond is required. This bid bond can be a 5% certified check or a typical 5% bid bond from an insurance company. Certified checks will be returned after the award process. All projects estimated to cost over $50,000 will require a 100% Performance Bond be attained by the selected contractor. The Architect: CBS Squared Inc 770 Technology Way Suite 1A Chippewa Falls WI 54729 715-861-5226 Wage Rates Prevailing wage rates do not apply. Clarification of the IFB If the vendor feels that further background or technical information is required contact Josh Pedersen at 715-839-4787. In the event the Contractor, without excuse, fails to achieve Substantial Completion within the Contract Time, the Contractor shall pay to the Owner as liquidated damages, and not as a penalty, the sum of One Thousand Dollars ($1,000.00) for each and every calendar day following the end of the Contractor Time until Substantial Completion is achieved. However, the Contractor shall not be liable for liquidated damages for a day, or days, of excusable delay occurring during such period following the end of the Contract Time. The Contractor shall achieve Final Completion of the entire Work, not later than July 15, 2024, notwithstanding the provisions of 9.10.1 of A201-2007 as modified.

Bid Results

Clubhouse / Community Centers

$199,500.00

Public - County

Renovation

1

5

8

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
12
Bidding Soon
247
All Active Projects
96
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

April 8, 2024

img_map_placeholder

721 Oxford Ave, Eau Claire, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.