BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 15, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Bethel, Vermont. Completed plans call for site work for a water / sewer project.

For Christian Hill Project The Town of Bethel is accepting proposals from contractors to install (up to/not to exceed) 2,000' of 6" underdrain (including fabric and drainage stone), ditch, and add to road base with approximately 2,000 ton of road base/gravel as determined by Road Foreman. Some areas may require removal of failed road base, but that will be determined with the Road foreman. Ditches may require seeding, but that will be determined by the Road Foreman in conjunction with the contractor. Contractors shall furnish all materials, labor and equipment necessary to complete work, including disposal of the debris/material in these segments in accordance with the State of Vermont act 64 standards. They will also be responsible for providing flaggers as needed and adhering to all MUTCD Standards. The chosen Contractor will work under the direction of the Road Foreman. Invoicing shall be for work satisfactorily completed and paid as one lump sum. The chosen Contractor shall warranty materials and workmanship for a period of one (1) year from the date of completion. The Contractor or their subcontractor shall complete all remedial/warranty work at no additional cost to the Town within 60 days of any such order to repair. Work shall be completed by July 30, 2023. No mobilization charges will be permitted. The Chosen Contractor shall contact Dig Safe. Proposals shall be submitted on the form provided and must be signed by the Contractor or his authorized representative. The Town reserves the right: 1. to accept or reject any or all Proposals in whole or in part and to accept other than the lowest price proposal; 2. to amend, modify, or withdraw this Request for Proposals; 3. to require supplemental statements or information from proposers; 4. to extend the deadline for responses to this Request for Proposals; 5. to waive or correct any irregularities in Proposals received, after prior notice to the proposers; 6. And to negotiate separately with competing proposers. Questions about this Request for Proposals or requests for further information, shall be emailed to the Town Manager, Therese Kirby at betheltownfinance@comcast.net, no later than Friday, February 24, 2023 at 1 pm.

Award

Water / Sewer

$138,375.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
89
Bidding Soon
1,190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

April 3, 2023

Project location map

Christian Hill Rd, Bethel, VT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.