BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Sedona, Arizona. Contact the soliciting agency for additional information.

The Sedona-Oak Creek Airport Authority is requesting Statements of Qualification (SOQ) to provide Engineering Services, under a qualified engineering firm registered in the state of Arizona and are exclusive to this project only. The services are to be carried out in accordance with Federal Aviation Administration (FAA), and all applicable Federal, State, and Local Codes, Regulations, Ordinances, and Policies. Respondents should be aware that the use of the Airport is subject to the Airport's policies and procedures, Federal, State, County, and City laws, regulations and ordinances, and other governmental and regulatory bodies. It is each respondent's obligation to review and be aware of all applicable laws, ordinances, regulations, policies, and restrictions. An evaluation committee will be selected to review and rank all proposals based on the evaluation criteria set forth in Section X. The evaluation committee shall determine whether a respondent's proposal is responsive, responsible, and meets the RFQ's minimum qualifications. SOCAA reserves the right, at any point in the process, and at its sole discretion, to: determine a proposal is non-responsive or non-responsible, determine that a proposal is not susceptible for award, terminate negotiations with any and all respondents, reject any and all proposals at any time, waive any informality in proposals received, except with respect to the date, time, and place where documents are submitted, cancel this RFQ in whole or in part, reissue this RFQ, and/or to accept or reject items of proposals received. Proposals that are later found to be non-responsive or nonresponsible, or which contained any material misrepresentation, may be grounds for termination of any subsequent lease or license. Although not mandatory, any potential respondent is encouraged to register with SOCAA no later than February 20th, 2023 by sending an email to Mr. Edward Rose, Airport Manager (ed@sedonaairport.org), including the potential respondent's name, address, phone number, and email address, as well as a designated contact person. The method of contractor selection has not been determined at this time.

Conceptual

Transportation Terminals

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
4
Bidding Soon
76
All Active Projects
31
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2023

img_map_placeholder

Multiple Locations, Sedona, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.