BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Sedona, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Tracs No : 089A YV 353 F0443 01C Project No : A89-A(212)T Termini : Prescott Flagstaff Highway (SR 89a) Location: Main St - Verde River Bridge A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. The bidder to whom an award is made will be required to execute a Performance Bond and a Payment Bond, each in 100 percent of the amount of the bid, an Insurance Certificate and the Contract Agreement The minimum goal for participation by DBEs on this project is as follows: 6.04 Percent. The time allowed for the completion of the work included in this contract will be 115 working days. AZDOT - Pavement Rehabilitation- SR 89A

Award

Roads / Highways

$3,195,385.00

Public - State/Provincial

Paving, Site Work

41

3

24

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
8
Bidding Soon
106
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2023

July 4, 2023

Project location map

AZ-89A, Sedona, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.