Site work, paving and outdoor lighting for a mixed-use development in Burlington, Vermont. Completed plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; and water / sewer project.
As part of the northern section of the Burlington Greenway Rehabilitation, several "Pause Places" were designed to act as landmarks and resting areas along the Greenway, one of which was proposed for the intersection at the ice arena access path at Leddy Park. The City seeks an experienced landscape construction contractor or team of contractors skilled in grading, asphalt paving, concrete, stormwater infrastructure, and horticulture to aid in the construction of the Pause Place at Leddy Park. In addition to the Pause Place, a large bioretention area, designed as part of a stormwater permit with the Vermont Department of Environmental Conservation (VTDEC), must also be installed to offset impervious surface added as part of the Greenway Rehabilitation in the southern end of the City. The Pause Place includes replacement of the main walkways to the arena, construction of a concrete oval at the intersection with the Greenway, a fitness station mounted on a new concrete pad, bike racks and trash/recycling receptacles, new landscaping and walkway lighting, and signage. Under the main walkway to the arena, an existing culvert and an associated stone headwall must be reconstructed. In addition to the Pause Place, a large bioretention area, designed as part of a stormwater permit with the Vermont Department of Environmental Conservation (VTDEC), must also be installed to offset impervious surface added as part of the Greenway Rehabilitation in the southern end of the City. The bioretention basin includes excavation of the existing turf, installation of subsurface drainage, gravel, and bioretention soils, replacement of an existing inlet to tie in with existing storm infrastructure, and installation of topsoil, mulch and landscaping. As the Greenway is not only a recreation destination but also a transportation corridor, an 8-foot wide accessible route will need to be provided through or around the construction zone to allow pedestrians and cyclists to traverse the Greenway throughout construction. The project will also need to pause construction on the weekend of the Vermont City Marathon and include safe and secure pedestrian and spectator access coordinated with the City Project Manager with input from RunVermont staff. Questions due: Friday, February 17, 2023 by 5:00 PM
Award
Playgrounds / Parks / Athletic Fields
$569,424.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2023
March 30, 2023
1093 North Ave, Burlington, VT
Related To This Project
Burlington, VT
Bid Date: Mar 08 2023
Burlington, VT
Bid Date: Mar 17 2023
Burlington, VT
Bid Date: Mar 31 2023
Burlington, VT
Bid Date: Mar 15 2023
Burlington, VT
Bid Date: Apr 10 2023
Burlington, VT
Bid Date: Apr 06 2023
Burlington, VT
--
Burlington, VT
Bid Date: Feb 15 2024
Burlington, VT
--
Burlington, VT
Bid Date: Jun 12 2024
Burlington, VT
Bid Date: Feb 16 2023
Burlington, VT
Bid Date: Jan 31 2023
Burlington, VT
--
Burlington, VT
--
Burlington, VT
Bid Date: Jun 08 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.