BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Mokena, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

The therafin project consists of drainage work including new manholes, preparation of base, 950 ton of hma surface course, pavement striping, signage installation, 125 sf of sidewalk, grass restoration and misc. Appurtenant construction. 2. The hickory creek metra project consists of 17,000 sy of hma removal, removal & replacement of 300 lf of curb & gutter and 500 sf of sidewalk, 1,904 ton of hma binder course, 1,904 ton of hma surface course, pavement striping and misc. Appurtenant construction. Legal provisions: contractors and sub-contractors shall conform to the "public works preference project" act, (30 ilcs 560/1, et. Seq). Wage rates: contractors shall be required to pay not less than prevailing wage rates on the projects as established by the united states department of labor and the state of illinois department of labor. The village of mokena reserves the right to reject any and all bids or parts thereof and waive any technicalities or irregularities in the bids and disregard all non-conforming or conditional bids or counter proposals. Published by authority of the village of mokena. Project consists of drainage work, preparation of base, placement of 2.25" of HMA surface course, pavement striping, parking bumper & signage installation and grass restoration and mise, appurtenant work. Two Schedule of Prices shall be completed with a primary bid (Section Number FY23THERAFIN) for two phases of construction and an alternate bid (Section Number FY23THERAFINALT) for only one phase of Location- stone parking area at NEC of McGovney/Wolf

Award

Sidewalks / Parking Lot

$146,018.00

Public - City

Paving, Site Work

3

4

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
119
Bidding Soon
1,801
All Active Projects
823
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

img_map_placeholder

To Be Determined, Mokena, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.