BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Butte, Montana. Completed plans call for site work for a bridge / tunnel.

PROJECT SITE: TWIN BRIDGES ROUTE: MT-287 MILEPOST: 33.8 - 42.1 AVERAGE ROADWAY WIDTH: 32' SPECIFICATIONS FOR WORK: Prior to chip seal the Contractor is responsible to provide all labor, materials, equipment, incidentals, and traffic control necessary to crack seal 8.3 miles of road on route MT-287. Average roadway width is 32 feet. Cracks shall be routed and sealed per the special provision. Contractor shall provide all labor, equipment, materials, incidentals, and traffic control necessary to produce, haul, place, roll and broom approximately 155,819 square yards of laid-in-place chip seal. The chip seal will be approximately 8.3 miles long and 32 feet wide. Contractor shall provide CHFRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. Contractor must provide enough pilot cars to keep traffic stops to a maximum of 15 minutes. The emulsion application rate for chip seals is estimated at .44 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. The Contractor will provide final striping. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above.

Award

Bridges / Tunnels

$564,167.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
12
Bidding Soon
205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

Project location map

Multiple Locations, Butte, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.