Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Fort Morgan, Colorado. Completed plans call for site work for a water / sewer project.
This project generally consists of 5 projects A-E involving the new, relocated and full replacement of sanitary sewer manholes of various depths throughout the City including the replacement of some clay sewer main to PVC of various sizes and reestablishment of service taps. No pre-bid meeting will be held. Questions: All questions regarding this bid should go to Erik Sagel, Wastewater Collection Superintendent at (970) 542-3911. Questions must be in writing and can be e-mailed to erik.sagel@cityoffortmorgan.com. The cut-off date and time for questions is February 22, 2023 at 9:00 a.m. It is the responsibility of the prospective bidders to contact Erik Sagel to verify receipt of questions. Based upon such inquiry, the City may choose to issue an Addendum before and/or after the mandatory pre-bid meeting. The opening will not be a public bid opening as it will be subject to staff review of costs, schedule, options, qualifications, possible short list and/or interviews. Removal of old manhole, precast or brick, and manhole base including the piping and installing new PVC piping and fittings in a "pipethrough" configuration. Pouring new concrete base around installed piping and set new precast manhole to existing grade. Once installed, opening the top of piping within manhole to allow access for sewer maintenance equipment. a. Contractor shall be responsible for asphalt removal and haul off for each manhole and the transport of backfill material and millings to be used as the temporary patch upon completion. Dump site and material will be provided by the City. Final roadway paving will be provided under separate contract. b. The Contractor shall be responsible for excavation, removal and disposal of old manhole and piping and the installation of new piping, manhole, service connections and other applicable appurtenances. c. The Contractor shall be responsible for all applicable traffic control, per MUTCD standards. d. 22 brick and precast manholes ranging in depth between 9 feet and 14 feet deep will be replaced with new precast manholes of the same depth. e. The piping for the invert shall be replaced with PVC of the same size (8" or 10"). The piping configuration will be the same as the manhole removed including straight, 90-degree elbow or wye sweep utilizing PVC push-on fittings in a "pipe-through" installation. A concrete bench shall be installed around the sealed pipe configuration sloping to the midline of the piping. Once the bench is installed the top half of the piping shall be opened up through the entirety of the manhole to allow for maintenance equipment access. f. Piping from manhole invert shall be reconnected to existing piping outside of the manhole within 3 feet utilizing rubber Fernco compression style couplings. g. Sewer service connections previously tapped into the manhole being replaced or within the replacement area shall be re-established onto new mainline piping utilizing a factory wye fitting and reconnecting to existing service piping with appropriate fittings and a rubber Fernco compression style coupling. No taps will be allowed to be connected to the new manhole and tapping saddles will only be allowed on a case-by-case basis. h. Contractor will be responsible for locating and excavating around existing utilities and services located in the excavation area. i. Contractor shall be responsible for necessary flow by-passing and/or temporary stoppages. 2. Project B - Sanitary Sewer Manhole Removals: Removal and elimination of old manhole, precast or brick, and manhole base including the piping and installing new PVC piping in place. a. Contractor shall be responsible for asphalt removal and haul off for each manhole and the transport of backfill material and millings to be used as the temporary patch upon completion. Dump site and material will be provided by the City. Final roadway paving will be provided under separate contract.b. The Contractor shall be responsible for excavation, removal and disposal of old manhole and piping and the installation of new piping, service connections and other applicable appurtenances. c. The Contractor shall be responsible for all applicable traffic control, per MUTCD standards. d. 3 brick and precast manholes ranging in depth between 7 feet and 10 feet deep will be removed and straight PVC piping to be installed in place. e. Will replace 8 inch piping within removed manhole footprint for all but one manhole that requires 25 foot mainline replacement. Piping installed shall be reconnected to existing piping utilizing rubber Fernco compression style couplings. f. Sewer service connections previously tapped into the manhole being removed or within the replacement area shall be re-established onto new mainline piping utilizing a factory wye fitting and reconnecting to existing service piping with appropriate fittings and a rubber Fernco compression style coupling. Tapping saddles will only be allowed on a case-bycase basis. g. Contractor will be responsible for locating and excavating around existing utilities and services located in the excavation area. h. Contractor shall be responsible for necessary flow by-passing and/or temporary stoppages. 3. Project C - New Sanitary Sewer Manholes: Removal of old clay 8 inch mainline and installing new PVC piping and fittings in a "pipe-through" configuration. Pouring new concrete base around installed piping and set new precast manhole to existing grade. Once installed, opening the top of piping within manhole to allow access for sewer maintenance equipment. a. Contractor shall be responsible for asphalt removal and haul off for each manhole and the transport of backfill material and millings to be used as the temporary patch upon completion. Dump site and material will be provided by the City. Final roadway paving will be provided under separate contract. b. The Contractor shall be responsible for excavation, removal and disposal of old piping and the installation of new piping, manhole, service connections and other applicable appurtenances. c. The Contractor shall be responsible for all applicable traffic control, per MUTCD standards. d. 2 precast manholes ranging in depth between 9 feet to 10 feet deep to be installed in location where no manhole currently located. e. The piping for the invert shall be replaced with PVC of the same size (8"). The invert piping configuration will be the same as the existing mainline piping including straight, and wye sweep utilizing PVC push-on fittings in a "pipe-through" installation. A concrete bench shall be installed around the sealed pipe configuration sloping to the midline of the piping. Once the bench is installed the top half of the piping shall be opened up through the entirety of the manhole to allow for maintenance equipment access.f. Piping from manhole invert shall be reconnected to existing piping outside of the manhole within 3 feet utilizing rubber Fernco compression style couplings. g. Sewer service connections within the installation area shall be re-established onto new mainline piping utilizing a factory wye fitting and reconnecting to existing service piping with appropriate fittings and a rubber Fernco compression style coupling. No taps will be allowed to be connected to the new manhole with exception of the manhole located at West Bijou & Euclid and tapping saddles will only be allowed on a case-by-case basis. h. Contractor will be responsible for locating and excavating around existing utilities and services located in the excavation area. i. Contractor shall be responsible for necessary flow by-passing and/or temporary stoppages. Project Location Project B - Wilson Ave. / Cherry St. behind 913 Wilson Ave
Award
Water / Sewer
$391,490.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2023
April 3, 2023
Multiple Locations, Fort Morgan, CO
Related To This Project
Fort Morgan, CO
Bid Date: Feb 15 2023
Fort Morgan, CO
Bid Date: Mar 15 2023
Fort Morgan, CO
Bid Date: Mar 15 2023
Fort Morgan, CO
Bid Date: Mar 22 2023
Fort Morgan, CO
Bid Date: Mar 13 2023
Fort Morgan, CO
Bid Date: Mar 29 2023
Fort Morgan, CO
Bid Date: Mar 22 2023
Fort Morgan, CO
Bid Date: Apr 28 2023
Fort Morgan, CO
Bid Date: Nov 20 2023
Fort Morgan, CO
Bid Date: Feb 02 2023
Fort Morgan, CO
Bid Date: Jan 25 2023
Fort Morgan, CO
Bid Date: Feb 10 2023
Fort Morgan, CO
Bid Date: Jan 27 2023
Fort Morgan, CO
Bid Date: Jan 27 2023
Fort Morgan, CO
Bid Date: Dec 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.