Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Kirkwood, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.
General information and instructions to respondents are contained herein. The successful Bidder shall be required to comply in all respects with the State Statutory provisions concerning the payment of prevailing wages on Public Services, Section 290.262 and shall pay to all workmen performing work under the Contract not less than the prevailing hourly rate of wages as determined by the Dept. of Labor and Industrial Relations of the State of Missouri. All questions shall be submitted in the City's e-Procurement platform, Ionwave by close of business day on February 17th , 2023. Any contact by Contractor in regard to this bid proposal with City personnel other than those defined above may be considered grounds for dismissal of Contractor's Bid Proposal Response. This information is provided for general information and does not constitute part of the Contract. The successful Bidder shall comply with strict conditions of the Contract Documents. Should any conflict arise between this information and the Contract Documents, the Contract Documents shall prevail. Work by Contractor: 1. Install Temporary Traffic Control Devices as per the latest edition of the FHWA Manual of Uniform Traffic Control Devices. 2. Removal and Replacement of Concrete Sidewalk (4-inch thickness or greater) 3. Removal and Replacement of deficient ramps with concrete ADA curb ramps (7-inch thick) to be installed per specifications where existing ramps are located. 4. Removal and Replacement of Residential Concrete and Asphalt Approach (6-inch) 5. Removal and Replacement of Commercial Concrete Entrance (7- inch) 6. Asphalt and concrete curb and gutter spot repair as needed. 7. Base Repair as needed. 8. Place and remove advance notification signs along milling route. 9. Milling of the existing pavement and/or application of Type C Bituminous asphaltic wedge and leveling courses, as needed. 10. Butt Joint and Edge Milling of existing pavement to accept the Type A ultra-thin bonded wearing course. 11. Adjustment of manholes to Grade as needed. 12. Place and remove advance notification signs along paving route. 13. Placement of a Type A ultra-thin bonded wearing surface immediately preceded by an application of a warm Cationic Polymer Modified Emulsion Membrane (CPEM-1). The Cationic Polymer Modified Emulsion Membrane (CPEM-1) shall be spray applied immediately prior to the application of the Type A Ultrathin Bonded Wearing Surface overlay so as to produce a homogeneous wearing surface that can be opened to traffic immediately upon sufficient compaction and cooling. The finished wearing surface shall have a minimum compacted thickness of 1/2 inch. 14. Temporary stop bar striping shall be completed where it has been removed. 15. Asphalt curb. Spot removal and replacement; sealing of existing curb. 16. Backfill disturbed areas with topsoil, seed and straw. 17. Remove Traffic Control Devices. The following is list of manhole locations by address within each site: Site Each Location 1 1 528 North Harrison Avenue 1 1 North Harrison Avenue and Way Avenue 1 1 434 North Harrison Avenue 1 1 435 North Harrison Avenue 1 1 Northbound North Harrison at West Washington Avenue 1 1 245 West Adams Avenue 2 2 West Washington Avenue at 415 North Clay 3 1 303 Way Avenue 3 1 324 Way Avenue 3 1 338 Way Avenue 4 1 443 South Taylor Avenue 4 1 385 South Taylor Avenue 4 1 South Taylor Avenue and Clinton Place 4 1 356 South Taylor Avenue 4 1 South Taylor Avenue at 345 South Fillmore Avenue 4 1 328 South Taylor Avenue 4 2 South Taylor Avenue at 210 East Monroe
Award
Roads / Highways
$626,558.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2023
May 1, 2023
Multiple Locations, Kirkwood, MO
Related To This Project
Kirkwood, MO
Bid Date: Mar 06 2023
Kirkwood, MO
Bid Date: Mar 24 2023
Kirkwood, MO
Bid Date: Mar 28 2023
Kirkwood, MO
Bid Date: Apr 06 2023
Kirkwood, MO
Bid Date: Apr 05 2023
Kirkwood, MO
Bid Date: Apr 18 2023
Kirkwood, MO
Bid Date: Feb 20 2023
Kirkwood, MO
Bid Date: Feb 27 2023
Kirkwood, MO
Bid Date: Feb 21 2023
Kirkwood, MO
Bid Date: Feb 23 2023
Kirkwood, MO
Bid Date: Feb 21 2023
Kirkwood, MO
Bid Date: Jan 23 2023
Kirkwood, MO
Bid Date: Jan 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.