Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Gray, Tennessee. Completed plans call for the renovation of a educational facility.
Should any questions arise regarding these specifications, you may contact Phillip Patrick at 423-753-1100 Daniel Boone High School- Removal & disposal of the existing damaged flooring. Install a new fixed, wood sleeper and subfloor system consisting generally of resilient pads, plywood sleepers, plywood subfloor and steel anchors installed over a 6-mil polyethylene moisture barrier. 25/32" x 2 1/4 ", FIRST grade northern hard maple will be nailed approximately 16" on center. Anchored Rezill-Sleeper System DIN as manufactured by Connor Sports Flooring Corp (or product of same or better quality). Upon proper installation, the floor will be sanded smooth using coarse, medium and fine sandpaper, then rotary sanded or "screened" to remove all drum sander marks. The floor will then be sealed with TWO coats of Bona DTS, in preparation for the painting of game lines, lettering & logos as outlined below, using Bona SuperSport game line paint. Following the painting, THREE coats of WATER based gym floor finish will be applied to the entire court surface. After the finishing of the floor, 4" x 3" black vent cove base will be installed at the perimeter of the gymnasium floor and aluminum thresholds will be installed at each gymnasium doorway. Custom wood thresholds, ADA ramps and other styles of transitions differing from the aluminum thresholds described above will be priced separately. Pricing must include the detachment, moving and reattachment of the existing bleacher systems to allow the installation of the new flooring system. Replacement of (6) volleyball lids is also required. SCOPE OF WORK 1. Removal & disposal of the existing 10,000 +/- square foot court 2. Installation of new 10,000 +/- square foot floor system with FIRST Grade Maple 3. Sand, seal & finish 10,000 +/- square feet 4. Paint (1) Main Basketball Game Lines 5. Paint (1) Main Volleyball Game Lines 6. Paint (2) "DANIEL BOONE" End Court Lettering 7. Stain "B" Center Logo & Center Circle 8. Stain Three Point Areas 9. Detachment, Moving & Reattachment of Bleacher Systems during replacement 10. Replacement of (6) Volleyball Lids 11. Installation of vented cove base & thresholds Ridgeview Elementary School- Removal & disposal of the existing damaged flooring. Install a new fixed, wood sleeper and subfloor system consisting generally of resilient pads, plywood sleepers, plywood subfloor and steel anchors installed over a 6-mil polyethylene moisture barrier. 25/32" x 2 1/4 ", Second and Better grade northern hard maple will be nailed approximately 16" on center. Anchored Rezill-Sleeper System DIN as manufactured by Connor Sports Flooring Corp (or product of same or better quality). Upon proper installation, the floor will be sanded smooth using coarse, medium and fine sandpaper, then rotary sanded or "screened" to remove all drum sander marks. The floor will then be sealed with TWO coats of Bona DTS, in preparation for the painting of game lines, lettering & logos as outlined below, using Bona SuperSport game line paint. Following the painting, THREE coats of WATER based gym floor finish will be applied to the entire court surface. After the finishing of the floor, 4" x 3" black vent cove base will be installed at the perimeter of the gymnasium floor and aluminum thresholds will be installed at each gymnasium doorway. Custom wood thresholds, ADA ramps and other styles of transitions differing from the aluminum thresholds described above will be priced separately. Pricing must include the detachment, moving and reattachment of the existing bleacher systems to allow the installation of the new flooring system. Replacement of (4) volleyball lids, and the core drilling & installation of (2) volleyball sleeves/lids is also required. Additionally, approximately 50% of the stage flooring will need to be replaced. Contractor will field verify construction method of stage flooring. SCOPE OF WORK 1. Removal & disposal of the existing 10,000 +/- square foot court 2. Installation of new 10,000 +/- square foot gym floor system with SECOND and Better Maple 3. Remove and replace approximately 50% of stage flooring with OAK flooring to match 4. Replace stair treads and trim on both ends of stage 5. Sand, seal & finish 11000 +/- square feet of new gym AND stage flooring 6. Paint (1) Main Basketball Game Lines 7. Paint (1) Main Volleyball Game Lines 8. Paint (2) Cross Court Volleyball Game Lines 9. Paint (4) Badminton Game Lines 10. Paint (2) "RIDGEVIEW" End Court Lettering 11. Paint (1) 15' Multicolored Center Circle Logo 12. Painted Border 13. Paint (2) 1-26 One Color Numbers 14. Paint (2) A - Z One Color Letters 15. Detachment, Moving & Reattachment of Bleacher Systems during replacement 16. Replacement of (4) Volleyball Lids 17. Core Drilling & Installation of (2) Volleyball Sleeves & Lids 18. Installation of wall base & threshold
Award
Educational
$128,500.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2023
March 23, 2023
Multiple Locations, Gray, TN
Related To This Project
Gray, TN
Bid Date: Mar 02 2021
Gray, TN
Bid Date: Apr 16 2020
Gray, TN
Bid Date: Apr 19 2024
Gray, TN
Bid Date: Apr 23 2024
Gray, TN
Bid Date: Jul 02 2024
Gray, TN
Bid Date: Sep 28 2022
Gray, TN
Bid Date: Jun 16 2022
Gray, TN
Bid Date: Jun 24 2022
Surgoinsville, TN
Bid Date: Mar 10 2023
Kingston Springs, TN
Bid Date: Feb 17 2023
Hendersonville, TN
Bid Date: Mar 03 2023
Knoxville, TN
Bid Date: Mar 07 2023
Nashville, TN
Bid Date: Mar 01 2023
Nashville, TN
--
Dayton, TN
Bid Date: Mar 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.