Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a civil project in Bethany, Illinois. Completed plans call for the renovation of a water / sewer project.
Sealed Bids for the construction of the Electrical Improvements, Water System Improvements Project will be received, by the Village of Bethany. The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: An emergency ATS (automatic transfer switch) at the existing water plant generator for water plant Wells #1 and #4, emergency chlorine shutoff system at the water plant, interior dehumidification equipment at the water plant, an emergency generator and ATS (automatic transfer switch) at the Well #6 and #7 remote locations, and a new water treatment plant control panel and general electric work. The Project timeframe is 100 days and is intended to be constructed in Spring 2023 / Summer 2023. Representatives of the Owner and Engineer will be present to answer questions regarding the project and bidding procedures. All prospective bidders are urged to attend. Bids will be received for a single prime Contract. Bids shall be on a unit price or lump sum basis, with bid items as indicated in the Bid Form. The project engineer for the project is Greg Gustafson, P.E., ggustafson @bernsclancy.com. printed Bidding Documents may be obtained from the Issuing Office either via in-person pick-up or via mail, upon Issuing Office's receipt of payment for the Bidding Documents. The nonrefundable cost of printed Bidding Documents is $100 per set, payable to "Berns, Clancy and Associates". Upon Issuing Office's receipt of payment, printed Bidding Documents will be sent via FedEx. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. To request documents call 217-384-1144 or email projects@bernsclancy.com. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statues mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The De Minimis Components, Minor Components and Pig Iron waivers apply to this contract. Owner: Village of Bethany. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
Post-Bid
Water / Sewer
$207,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2023
May 19, 2023
To Be Determined, Bethany, IL
Related To This Project
Bethany, IL
Bid Date: Jan 27 2022
Bethany, IL
Bid Date: Mar 11 2022
Bethany, IL
Bid Date: Feb 06 2024
Bethany, IL
Bid Date: Feb 21 2024
Bethany, IL
Bid Date: Apr 27 2023
Bethany, IL
Bid Date: Feb 09 2023
Bethany, IL
Bid Date: Jun 07 2022
Bethany, IL
Bid Date: May 26 2022
Bethany, IL
Bid Date: Mar 15 2022
Bethany, IL
Bid Date: Dec 06 2022
Bethany, IL
Bid Date: Feb 07 2023
Bethany, IL
Bid Date: Apr 27 2023
Calumet Park, IL
Bid Date: Mar 10 2023
Sesser, IL
Bid Date: Mar 09 2023
Crystal Lake, IL
Bid Date: Feb 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.