BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Rock Island, Illinois. Completed plans call for the renovation of a residential development.

The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. Remove all the existing gas piping and hangers. Install a new gas fired power vent 40-gal water heater. Install new approved gas piping to supply the water heater, furnace, kitchen stove and laundry coming from the gas meter. Install supply water lines from meter to the kitchen rough- in, bathroom rough- in, water heater, laundry room wash box, and outside silcock. The outside silcock location is preferred at the rear of the house, also install a shut off valve in the basement to isolate the water incase of line breakage do to freeze up. Plumbing contractor will be responsible for all the fixtures needed to furnish the house, standard toilet bowl & tank, tub-shower combo unit, shower faucet & drain with trim, lavatory and sink/top with over flow, lav. faucet, kitchen 2 bowl stainless sink, one-piece faucet with sprayer and drain baskets. There will be no dishwasher or garbage disposal installed. Delta fixtures preferred for faucets no need to be top of the line. Will need a rough- in that will enable homeowner to attach an icemaker line, located in the wall with a shut off behind the refrigerator. Contractor upon signing the contract must camera the sewer line from the house to the street to locate any possible issues needing addressed. The water curb box and valve has been recently replaced and is in proper working order. The main sewer stack and vent will need to be removed and replaced with all new PVC starting from the basement floor throughout the house. Plumbing permit required before work starts.

Award

Residential Subdivision

$14,990.00

Public - City

Renovation

4

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
32
Bidding Soon
551
All Active Projects
273
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

April 3, 2023

img_map_placeholder

1830 32nd St, Rock Island, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.