BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and asbestos abatement for a mixed-use development in Independence, Missouri. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

The School District reserves the right to reject any or all proposals and to waive any technicalities therein. The Project means the building abatement and demolition of: Fort Osage High School & Elm Grove Elementary School Independence, Missouri Fort Osage R-I School District Direct all questions to: Roth Environmental Consultants, Inc. 7200 West 132nd Street, Suite 360 Overland Park, KS 66213 Phone: 913.663.9920 Contact: Steven A. Roth, President E-Mail: sroth@rothenvironmental.com Additional sets of the bid documents may be purchased by paying the cost of reproduction and shipping. Project Schedule Part 1: Shall include the High School Band Room Areas and limited Locker Room abatement Segments. Contractor shall consult the HS ACBM Schedules for locations and ACM Materials to be abated during the Spring Break Period. These areas are noted as Space Number 1 through 8 on the ACBM Schedules and highlighted in blue. Substantial Completion of Spring Break Part 1 shall be by Thursday, March 30, 2023, at 4:00 pm., CST. Summer Break Period Begins on Wednesday, May 24, 2023, through August of 2023. Part 2: Shall include the following: High School Kitchen. Elm Grove Kitchen. Part 3: Shall include the following Cafeteria, Concession Area(s) And Commons Area outside Cafeteria. Denoted by Space Numbers 9 through 23. The Summer scope of work shall also include the Cafeteria areas of Elm Grove Elementary School. Corresponding material listings and quantities are listed within the appropriate ACBM Schedules. Substantial Completion of Summer Break Part 2 shall be by Thursday, June 1, 2023, at 4:00 pm., CST. Substantial Completion of Summer Break Part 3 shall be by Monday, June 12, 2023, at 4:00 pm., CST.

Post-Bid

Educational

$120,000.00

Public - City

Asbestos Abatement, Site Work

6

9

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
38
Bidding Soon
720
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2023

May 24, 2023

img_map_placeholder

Multiple Locations, Independence, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.