BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Middleburgh, New York. Completed plans call for the renovation of a municipal facility.

Middleburgh Kitchen Renovation - 195 Grove Street Middleburgh, NY 12122. OPWDD's Capital District DDSO is looking to obtain bids for kitchen installation our home located at 195 Grove St, Middleburgh, NY per the attached scope of work. This is a NYS Public Works Project and Prevailing Wages MUST be paid. Any questions or requests for clarification regarding the information provided may be directed to psespurchasing@opwdd.ny.gov. To be considered for this project, all bids must be submitted on bid form provided and include the materials and labor cost break down. Removal of existing upper and lower cabinetry per prints provided o Removal of decorative back splash o Removal of lighting. o Removal of fixtures. o Removal of sheetrock to exposed wall studs. o Removal of existing Pantry, shelving and walls o Removal of existing flooring and underlayment. o Removal of existing Bay window over sink area. o Removal of door and door frame on south wall o Installation of sheetrock including taping, joining and wall covering per prints and specifications. o Installation of new window above sink per prints and specifications. o Repair/replacement of plumbing supply and drains for sink and/or refrigerator with ice maker. Per the NYS plumbing code. o Repair/replace existing electrical outlets/hookups/switching o Framing / sheetrock new pantry according to prints o Framing / sheetrock of south wall to match existing hall including handrails and baseboard. o Installation of new flooring underlayment and premium vinal flooring per prints and specification o Installation of new cabinetry per design/manufacture/prints provided o Installation of new lighting per the prints provided with this scope of work o Installation of new plumbing fixtures o Installation of temporary countertop (3/4'' BDX plywood) o OPWDD shall be responsible for the installation of the permanent countertop. o All third-party inspection costs will be the responsibility of the vendor. o All work is subject to OPWDD and third-party inspection o All work shall be done to NYS Building code / Plumbing Code / Electrical Code o All electrical work will be inspected by a third-party inspection agency and all costs associated will be the responsibility of the vendor. o Vendor will be responsible for any damage during the install. Work must be completed within _120_ day

Post-Bid

Municipal

$50,000.00

Public - State/Provincial

Renovation

13

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
79
Bidding Soon
1,257
All Active Projects
597
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

July 7, 2023

img_map_placeholder

195 Grove St, Middleburgh, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.