BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Townsend, Tennessee. Completed plans call for site work for a sidewalk / parking lot.

CONCRETE PAD WORK AT CADES COVE CAMPGROUND Period of Performance: 4/10/2023 -4/9/2024 Construction Wage Rates: Blount County Proposal should include Name and complete address, including street, city, county, state, ZIP code, electronic address, and Unique Entity ID number. This acquisition is a 100% set aside for Small Business The primary NAICS code is 238110 Poured Concrete Foundation and Structure Contractors, Size standards in millions of dollars 16.5. . In accordance with FAR Subpart 36.204, the magnitude of construction is estimated (a) Between $ 00.00- $ 200,000.00 Type of Contract: Firm-Fixed Price Construction. No legal liability on the part of the government for any payment may arise for performance under this contract beyond the amount that has been authorized through issuance of written contracts. Submit Proposal to: Geraldine Larsen, Contract Specialist/Buyer Via email: geraldine_larsen@nps.gov To include in you Proposal: 1. Technical Approach 2. Identify of key Personnel to be responsible for the on-site work and their qualifications. 3. Safety Plan 4. Contractors' quality Control Plan 5. Proof of Insurance-Liability 6. Price Schedule sheet (attachment #2) 7. SF 1442 signed The Technical proposal should be specific and complete. Legibility, clarity and coherence are very important. All the requirements specified in the solicitation are mandatory. By your proposal submission you are representing that your firm will perform all the requirements specified in the RFP. A written technical proposal shall be submitted addressing the evaluation factors contained within the RFP. All of the evaluation criteria must be met in order for the proposal to be considered responsive. A non-responsive submittal will not undergo further review once it is deemed non-responsive and will be eliminated from consideration. Evaluation Factors: 1. Did the contractor include a narrative response that explains how the work will be accomplished Written narrative is required to be considered responsive. Did the contractor identify key personnel 3. Did the contractor include two (2) past performance records from US Government projects of similar scope that were successfully completed within five (5) years from the date of their respective proposal's submission These past performance evaluations are required to be considered responsive. Evaluation will be based on Strengths or Weakness to determine technically acceptable. Send proposal to geraldine_larsen@nps.gov -- Request for Proposal (RFP) Closes: 4/1/2023 NOON ED send all proposals via email to geraldine_larsen@nps.gov Question cut-off: 3/16/2023 NOON ED Send all questions to geraldine_larsen@nps.gov An amendment to the solicitation will be performed with the responses. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The contractor shall provide all labor, tools, equipment, materials and supervision required to remove existing degraded asphalt parking pads and replace with 6" of concrete to the same dimensions at multiple parking sites throughout the Cades Cove Campground. Contractor Responsibilities: o Saw cut existing asphalt pad at the roadway edge to provide a smooth transition and prevent damage to the roadway. o Remove asphalt overlay and haul to the nearest asphalt plant for recycling. o Reuse/Regrade existing base stone in preparation for concrete. o Provide all forming materials for parking pads, parking pads range in size from 14' x 45' to 12' x 36', all to be at a 6" depth (+ or - a 1/2 "). o Construct Forms that provide for drainage with no more than a 2% cross slope. o Provide concrete to the following specifications: 4000 psi, fiber mesh reinforced, Federal Standard 595C Color 26081 (dark gray), accelerator or retarder as need. o Expansion joints or saw cuts every 20'. o Place concrete to NPS Standards o Float and "broom" finish concrete o Once concrete has set, remove all forming material without damage to concrete, fill in and level around concrete pad to prevent tripping hazards. o Return site to a "ready to use" condition.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
25
Bidding Soon
554
All Active Projects
241
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2023

April 10, 2023

img_map_placeholder

10042 Campground Dr, Townsend, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.