Site work and paving for a sidewalk / parking lot in Grand Junction, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000312735 Construct 5800 feet of trail from Leach Creek south of Junior Service League Park westerly to the Redlands Parkway Bridge utilizing the following scope/specifications:The existing 8 foot asphalt trail shall be replaced with 6 inch thick, 10 foot wide concrete trail on 4 inches of CDOT Class 6 Two foot wide, 10 inch thick CDOT Class 6 shoulders at no more than 2% cross fall. Sawcuts shall be no less than 5 feet and not greater than 8 feet. Center saw cut required. All side slopes beyond the shoulders shall be no greater than 2:1 to catch points. All clearing and grubbing. All traffic control associated with the closure. Easement modification may be necessary from 2399 Riverside Parkway. Contractor responsible to obtain any easements and/or temporary construction easements necessary. 40 calendar days to complete the project (based on 200 feet per day average) Contractor responsible for all engineering, construction, and testing associated with the project. Pricing will be lump sum amount. The purpose of this IFB is to obtain competitive bids from qualified and interested companies for all labor, equipment, materials, and supplies required for the concrete trail construction along areas of Leach Creek and Redlands Parkway. All dimensions and Scope of Work should be verified by Contractors prior to submission of bids. Bid Guaranty consisting of a certified or cashier's check drawn on an approved national bank or trust company in the state of Colorado and made payable without condition to the City; or a Bid Bond written by an approved corporate surety in favor of the City. The amount of the Bid Guaranty shall not be less than 5% of the total Bid amount Question Acceptance Deadline 03/20/2023 07:00 PM EDT Questions are submitted online No

Bid Results

Sidewalks / Parking Lot

$657,483.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
6
Bidding Soon
90
All Active Projects
29
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2023

June 1, 2023

img_map_placeholder

Redlands Pkwy, Grand Junction, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.