Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 12, 2023 at 8:00 PM
Updated January 26, 2024
Site work and renovation of a mixed-use development in Athens, Ohio. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.
Campus Aesthetic Improvements Phase II 2023 EDGE Participation Goal: 5.0% of contract Domestic steel use is required per ORC 153.011. Contract Estimated Cost Base Bid $497,000.00 Alternate G-1 : Alden Library - Soft Washing Building $40,000.00 Alternate G-2: Alden Library - Window Resealing $26,000.00 Alternate G-3: Brick Pavers over Geo-grid $26,000.00 More Info: Contact Trent DeBruin with VSWC Architects via email at trent.debruin@vswc.com. Question Deadline 03/21/2023 A. The Project will have one General Contract Bid Package covering all work on the Project, except as specifically noted otherwise. 1. Multiple Campus locations - Rinsing exterior masonry, cleaning of all brick and stone masonry with an approved masonry cleaner, rinse of the concrete plaza deck and steps, rinsing of exterior wood trim and masonry, rinsing of sidewalks around the perimeter, rinsing of all columns and trim, and includes all labor, material, and equipment needed to complete the scope. 2. Removal of existing gravel walkway and construction of new concrete sidewalk. B. Existing Conditions: Contractor shall include Work made necessary by field conditions that may not be shown in the Contract Documents but that are apparent during an inspection of the construction site. Contractor shall conduct a preconstruction survey using video and/or photographs and provide copies to the Architect for record. C. Permits: It is solely the contractor's responsibility to obtain any and all necessary permits related to this project. D. Safety: The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of his Work. The Contractor shall take reasonable precautions for safety and protection to prevent damage, injury or loss. E. Tests & Inspections: 1. Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordinances, rules, regulations or orders of public authorities having jurisdiction shall be made at the appropriate time and shall be scheduled by the Contractor. The Contractor shall give timely notice of the schedule of such procedures. F. General Installation Guidelines 1. Do not use tools or equipment that produce harmful noise levels. 2. Use products, cleaners, and installation materials that are not considered hazardous. G. Conflicting Requirements: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to the Architect for a decision before proceeding. H. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to the Architect for a decision before proceeding
Bid Results
Educational
$428,540.00
Public - State/Provincial
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2023
May 5, 2023
Multiple Locations, Athens, OH
Related To This Project
Athens, OH
Bid Date: Mar 21 2023
Athens, OH
Bid Date: Mar 21 2023
Athens, OH
Bid Date: Mar 09 2023
Athens, OH
Bid Date: Apr 10 2023
Athens, OH
Bid Date: Mar 04 2020
Athens, OH
Bid Date: Apr 24 2023
Athens, OH
Bid Date: Apr 09 2020
Athens, OH
Bid Date: Jan 04 2024
Athens, OH
Bid Date: Mar 07 2023
Athens, OH
Bid Date: Apr 27 2023
Athens, OH
Bid Date: Nov 09 2023
Athens, OH
Bid Date: Nov 16 2023
Athens, OH
Bid Date: Apr 05 2023
Athens, OH
Bid Date: Feb 21 2023
Athens, OH
Bid Date: Feb 16 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed