Site work and renovation of a mixed-use development in Athens, Ohio. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Campus Aesthetic Improvements Phase II 2023 EDGE Participation Goal: 5.0% of contract Domestic steel use is required per ORC 153.011. Contract Estimated Cost Base Bid $497,000.00 Alternate G-1 : Alden Library - Soft Washing Building $40,000.00 Alternate G-2: Alden Library - Window Resealing $26,000.00 Alternate G-3: Brick Pavers over Geo-grid $26,000.00 More Info: Contact Trent DeBruin with VSWC Architects via email at trent.debruin@vswc.com. Question Deadline 03/21/2023 A. The Project will have one General Contract Bid Package covering all work on the Project, except as specifically noted otherwise. 1. Multiple Campus locations - Rinsing exterior masonry, cleaning of all brick and stone masonry with an approved masonry cleaner, rinse of the concrete plaza deck and steps, rinsing of exterior wood trim and masonry, rinsing of sidewalks around the perimeter, rinsing of all columns and trim, and includes all labor, material, and equipment needed to complete the scope. 2. Removal of existing gravel walkway and construction of new concrete sidewalk. B. Existing Conditions: Contractor shall include Work made necessary by field conditions that may not be shown in the Contract Documents but that are apparent during an inspection of the construction site. Contractor shall conduct a preconstruction survey using video and/or photographs and provide copies to the Architect for record. C. Permits: It is solely the contractor's responsibility to obtain any and all necessary permits related to this project. D. Safety: The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of his Work. The Contractor shall take reasonable precautions for safety and protection to prevent damage, injury or loss. E. Tests & Inspections: 1. Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordinances, rules, regulations or orders of public authorities having jurisdiction shall be made at the appropriate time and shall be scheduled by the Contractor. The Contractor shall give timely notice of the schedule of such procedures. F. General Installation Guidelines 1. Do not use tools or equipment that produce harmful noise levels. 2. Use products, cleaners, and installation materials that are not considered hazardous. G. Conflicting Requirements: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to the Architect for a decision before proceeding. H. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to the Architect for a decision before proceeding

Bid Results

Educational

$428,540.00

Public - State/Provincial

Renovation, Site Work

11

13

8

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
61
Bidding Soon
982
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2023

May 5, 2023

img_map_placeholder

Multiple Locations, Athens, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.