BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2024 at 7:00 PM

Updated February 29, 2024

Renovation of an educational facility in Eugene, Oregon. Working plans call for the renovation of a educational facility.

This project is being re-bid as both bidders were non-responsive on a requirement. Please follow for future updates. Quoters Are Encouraged to Send a Test Email to Email Address Above to Ensure They Have It Correct and That We Received It Accordingly. For Purposed of Receipt Time, the Sent Timestamp From the Quoter's Email Account Will Be Used. Briefly, the Work is Described as: Screen and Recoat of (9) Wood Gym Floors at 8 Sites. All Quotations Must Be Submitted on the Form Provided and Emailed to: Cip@4j.lane.eduonly Electronic Quotes Will Be Accepted. A License to Work With Asbestos-containing Materials Under Ors 468a.720 is Required for This Project.for Every Bid $100,000 or Greater, All Contractors and Subcontractors Shall Have a Public Works Bond, in the Amount of $30,000, Filed With the Construction Contractors' Board (Ccb), Before Starting Work on the Project, Unless Exempt.each Quote Shall Contain a Statement Indicating Whether the Quoter is a "resident Quoter", as Defined in Ors 279a.120. Each Quote Shall Contain a Statement That the "contractor Agrees to Be Bound by and Comply With the Provisions of Ors 279c.800 to 279c.870 Regarding Payment of Prevailing Wages" if Applicable. (if Total Project Cost is Above $50k, Contractor Required to Pay Prevailing Wages.)contractor Shall Certify Nondiscrimination in Obtaining Required Subcontractors, in Accordance With Ors 279a.110.the Successful Quoter Will Be Required to Furnish a Performance Bond and Labor and Materials Payment Bond in the Full Amount of the Contract Price. Certificates of Insurance as Described in the Terms and Conditions Will Be Required. Each Quote Must Be Submitted on the Prescribed Form. Each Quote Shall Be Accompanied by a Copy of a Surety Bond, Cashier's Check, or Certified Check, Executed in Favor of Eugene School District 4j, in the Amount Not Less Than Ten Percent (10%) of the Total Quote. Should the Quoter Refuse to Enter Into Such Contract or Fail to Furnish Certificates of Insurance as Required by the Supplementary Conditions Within Five (5) Working Days After Contract Forms Are Provided to the Quoter, the Amount of the Quote Security Shall Be Forfeited to the Owner as Liquidated Damages, Not as a Penalty. School District 4j Reserves the Right to Reject Any and All Proposals Received as a Result of This Request for Quotations and Select the Quote Which Appears to Be in the Best Interest of the District. **Bid notes:

Final Planning

Educational

$23,996.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
4
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

August 19, 2024

Project location map

Multiple Locations, Eugene, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.