BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2025 at 7:00 PM

Updated February 20, 2025

Site work for a water / sewer project in Mill Creek, Washington. Conceptual plans call for site work for a water / sewer project.

As of February 19, 2025, this project has been cancelled. Mill Creek Road currently lacks storm water conveyance (pipes and catch basins) along the south/southeast side of the street from the intersection of this street with Bothell-Everett Highway to a point approximately 1400 feet northeast. This area received water drainage from the vegetated slope along the road, as well as drainage flowing downhill on the street. During storms and other signficant surface water events, the water does not stay in the curb and gutter, but tends to flow out over the street surface (and can freeze during the winter season). This project will install approximately 1,400 lineal feet of storm water pipe and catch basins along the south/southeast side of the street to capture storm water more effectively before routing it to the existing storm water conveyance on the north/northwest side of the street before the base of the hill at the Mill Creek Rd/Bothell-Everett Highway intersection. This project will also include removing and replacing concrete curb and gutter and asphalt street surface for the total length of the improvement, and may also require replacing the guardrail on the south side of the street if it will be disturbed by construction activities. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Project Abandoned

Water / Sewer

$775,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
90
Bidding Soon
1,395
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

Project location map

Mill Creek Rd, Mill Creek, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.