Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
Site work and paving for a road / highway in Mill Creek, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
UPDATE :This project has been updated from a previous capital improvement project described in the 2021-2026 Capital Improvement Plan named EGUV Spine Road West Connection (Phase 1) or EGUV Spine Road (39th Ave SE to 44th Ave SE) (old Project #19-ROAD-15). This project proposes to evaluate options for a future ROW development for a transportation connection following the alignment of 33rd St NE between 41st Ave SE and 44th Ave SE. The original East Gateway Urban Village (EGUV) subarea plan envisioned a "Spine Road" extending between 39th Ave SE and 44th Ave SE, and part of the ROW needed for this connection was dedicated during approvals of adjacent developments. The remaining ROW acquisition needed still needs to be completed by the CIty and the property owners. However, preliminary design work for the new "spine road" found it to be very difficult and expensive to address stormwater management requirements for a full-width roadway for motorized vehicles. In the meantime, continuing development activities in the area, including the completion of The Farm in 2021, "filled in" part of the original "spine road" (between 39th Ave SE and 41st Ave SE) as a mainly local-access street. This makes a full multi-modal street development largely impractical due to high cost to gain a comparatively small benefit. An alternative as a bicycle/pedestrian shared-use pathway connection is scoped for this project. This alternative would exclude motorized vehicle use, but will substantially reduce the stormwater management requirements and the prohibitive costs of a full, multimodal roadway. This project will evaluate local and stakeholder interest in this more costeffective alternative, followed by design and construction in the future. The current design and construction estimate will be amended based on feedback from stakeholders regarding amendities (i.e. benches, trees, etc.) for this 750-foot route. Project is in City of Mill Creek capital budget fy 2025-2026 CIP ___________________________________________________________________________ This project has been updated from a previous capital improvement project described in the 2021-2026 Capital Improvement Plan named EGUV Spine Road West Connection (Phase 1) or EGUV Spine Road (39th Ave SE to 44th Ave SE) (old Project #19-ROAD-15). This project proposes to evaluate options for a future ROW development for a transportation connection following the alignment of 33rd St NE between 41st Ave SE and 44th Ave SE. The original East Gateway Urban Village (EGUV) subarea plan envisioned a "Spine Road" extending between 39th Ave SE and 44th Ave SE, and part of the ROW needed for this connection was dedicated during approvals of adjacent developments. The remaining ROW acquisition needed still needs to be completed by the City and the property owners. However, preliminary design work for the new "spine road" found it to be very difficult and expensive to address stormwater management requirements for a full-width roadway for motorized vehicles. In the meantime, continuing development activities in the area, including the completion of The Farm in 2021, "filled in" part of the original "spine road" (between 39th Ave SE and 41st Ave SE) as a mainly local-access street. This makes a full multi-modal street development largely impractical due to high cost to gain a comparatively small benefit. An alternative as a bicycle/pedestrian shared-use pathway connection is scoped for this project. This alternative would exclude motorized vehicle use, but will substantially reduce the stormwater management requirements and the prohibitive costs of a full, multimodal roadway. This project will evaluate local and stakeholder interest in this more cost-effective alternative, followed by design and construction in the future. The current design and construction estimate will be amended based on feedback from stakeholders regarding amenities (i.e. benches, trees, etc.) for this 750-foot route. As of February 19, 2025, this project is included in the City of Mill Creek's FY 2025-2030 Capital Improvement Plan (CIP). Further information regarding a design firm and timeline for construction has not yet been established. Funding for construction is allotted for FY 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$790,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 3, 2028
133rd St SE, Mill Creek, WA
Related To This Project
Mill Creek, WA
Bid Date: Apr 18 2023
Mill Creek, WA
--
Mill Creek, WA
--
Mill Creek, WA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.