BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Pentwater, Michigan. Completed plans call for site work for a playground / park / athletic field.

Timeframe for work to be accomplished: Anytime the week of May 1 through May 5, 2023. Specific work time(s) to be coordinated during this timeframe with successful bidder. Park Specification for Snow Fence removal: - Vendor Will Relocate Sand Away From Fences to Allow Park Staff to Easily Remove Fencing and Posts to Be Transported to Storage Area by Park Staff. Sand Should Be Removed From the Fences N a West to East Direction in Area a. In Area B and C, Remove Sand Directionally Based on How Fences Can Be Removed From Blown Sand the Fastest. - All Wind Blown Sand in Areas B, C and D Will Be Returned to the Beach Area a. And Areas B, C and D Will Be Leveled Flat to Sidewalk/parking Lot/road Grade. Areas B & C Will Be Leveled Down to Sidewalk/parking Lot Grade With Any Additional Sand Being Moved to Area a. - Grass and Debris Located in the Southeast End of the Day Use Parking Area Will Be Removed From the Park, Creating a 30 Foot Swath From the Edge of the Parking Lot Grade. Area on Map 2 Marked. -grass, Sand and Woody Debris Will Be Removed From the Park in the Area Along Lowell St. From the Park Entrance West to the Turn Around Creating a 15 Foot Swath From the Sidewalk Inward to Sidewalk Grade. Near the Playground Where There is Chain-link Fence, Sand Will Be Removed to Expose the Fence and Graded to Sidewalk and Parking Lot Levels. Area 2 Marked on Map. ** This Area Contains Decorative Boulders. The Boulders Will Have to Be Moved to Remove the Sand Then Put Back in Their Original Location. -sand and Grass Will Be Moved From the Campground Entrance Road as Marked on Map 2. -drifted Sand in Areas North and South of the Beach Parking Lot Entrance Roads (Areas B and C) is to Be Removed Down to the Level of the Roads and Parking Lot and Hauled to the Swim Beach (Area a) and Graded as Stipulated in the Area a Guidelines Below. The Areas Are Then to Be Graded and Leveled Between the Beach Area Parking Lot and the Campground and Park Entrance Roads. (Area B) -drifted Sand in the Volleyball Court Area (Area D) is to Be Removed and Relocated to Area a. The Volleyball Court is to Be Leveled Flat, Not a Declining Slope. The Dimensions of the Court Will Be a Minimum of 60' (North/south) by 130' (East/west) Flat Rectangle Using the Existing Metal Posts as the Center Line. - Beach Sand Will Be Pushed and Graded on a Continuous Declining Slope From the Walkway to the Water's Edge in a Manner Dictated by the Park Supervisor or His Representative. Area to Be Graded in This Manner as Illustrated as "Area a" on the Map Provided at the Pre-bid Meeting. - Sand Piled Up Near the Pier Railing Will Be Leveled Back to Sidewalk Grade. This Will Require Moving Rip Rap as Needed, Then Putting It Back in Place After Sand is Removed. - Vehicles and Equipment Used by the Vendor Will Not Be Allowed on Walkways or Patios Without Prior Approval of Park Supervisor. Snow fence removal will take place during the week of May 1 - May 5, specific times will be coordinated after the contract is awarded

Award

Playgrounds / Parks / Athletic Fields

$99,074.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
18
Bidding Soon
318
All Active Projects
138
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

May 1, 2023

img_map_placeholder

400 W Lowell St, Pentwater, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.