Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in Dyess AFB, Texas. Completed plans call for the renovation of a military facility.
The 7th Civil Engineering Squadron is in need of services to remove the existing breaker and install an operable (new or remanufactured) Eaton 300Amp 600Vac Pringle Breaker. *The contractor will be removing the Eaton 3000Amp 600Vac Pringle breaker and replacing it with the exact same model. The 7th Contracting Squadron (7 CONS) is seeking interested vendors who can provide services necessary to properly remove, repair, and replace the Eaton, 3000Amp 600Vac Pringle Breaker. The period of performance for this service is approximately 10 days to complete. Qualified vendors should email their expressed interest via e-mail to Elizabeth Rios-Santiago at elizabeth.rios-santiago@us.af.mil no later than 4:00PM, 16 March 2023. 1. DESCRIPTION OF SERVICES: The contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly remove and replace, Eaton, 3000Amp 600Vac Pringle Breaker. 1.1. The contractor shall prepare a material submittal for approval by the government prior to ordering or installing any material. Once these submittals are approved, notice to proceed will be given. Contractor shall order all materials after notice to proceed is given, and shall commence repair works within 21 calendar days upon arrival of materials. 1.2. Period of Performance: Based off the Statement of Work and materials needed for the proposed task, CES estimates approximately 10 days to complete desired project. 1.2.1. The period of performance shall be minimized to the maximum extent possible. 1.3. A pre-proposal site visit will be mandatory, with the presence of a CE Project Planner, for all contractors submitting proposals to identify all material, dimensions, specifications and work requirements. 1.4. The contractor shall comply with the NSPC (National Standard Plumbing Code), NEC (National Electrical Code), ASHRE , Heating Ventilation Air Conditioning standards, and Occupational Safety and Health Administration (OSHA) standards. 1.5. The contractor shall be responsible for coordinating with the building occupants through the facility manager to ensure there will be minimum interruptions to their daily mission. The contractor shall ensure the facility manager is notified of shut down fourteen (14) days in advance. The facility point of contact is Thomas Zipprich, Civ. and phone number is (325) 696-3374. The Project manager for the task will be Jeffrey Cardwell, (325) 696-5628. 1.6. Demolition and Removal: The Contractor will be removing (1) Eaton Pringle 3000Amp breaker and replacing with the exact same model. The Contractor will take the old breaker to be rebuilt in order to complete the reinstall. 1.7. Installation and Additive Services: 1.7.1. Electric 1.7.1.1. The Contractor shall initiate a service call for the purpose of changing the main 3000Amp 600Vac breaker for Building 6030-B. 1.7.1.2. The Contractor shall contact the Facility manager in order to set the timeline for the replacement of said breaker and for the purpose of discussing the time for a shutdown. 1.7.1.3. The Contractor shall ensure all power has been isolated from the area of concern prior to starting work on the replacement of said breaker and follow all LOTO rules and regulations. 1.7.1.4. The Contractor shall remove (1) existing Pringle 3000Amp 600Vac breaker in order to replace with the Re-manufactured breaker . 1.7.1.5. The Contractor shall upon replacement of the breaker, ensure the correct function of said breaker in accordance with the manufacturer's specifications. 1.7.1.6. The Contractor shall ensure that the voltage is correct and that the breaker has passed all functionality test prior to completing the Work Task. 1.7.1.7. The Contractor shall remove all work related trash/debris from the work area prior to leaving the area. 1.7.1.8. The Contractor shall notify the responsible person upon completion of the Work Task for the purpose of verifying that the Task has been completed in accordance with all rules and regulations governing the work in question. 1.8. Work shall be scheduled during normal business hours 0700-1600, however, the contractor may request and/or be required to perform work after normal duty hours or on weekends. 1.9. The contractor shall conduct the work in a manner to keep to a minimum disruption of normal operations. 1.10. The work may be in an operational or controlled area. In the event of an "actual" or "exercise" scenario, it may be required that the contractor stop work until the event is complete. This delay will not be an additional expense to the government. Lost construction time due to stop work will be added to performance time. 1.11. It is the responsibility of the contractor to restore any areas/facility components, disturbed by their work to their original state. The method of contractor selection has not been determined at this time.
Post-Bid
Military
$4,472,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2023
June 28, 2023
To Be Determined, Dyess AFB, TX
Related To This Project
Dyess AFB, TX
Bid Date: Mar 31 2023
Dyess AFB, TX
Bid Date: Apr 25 2023
Dyess AFB, TX
--
Dyess AFB, TX
Bid Date: Jul 27 2023
Dyess AFB, TX
Bid Date: May 05 2023
Dyess AFB, TX
Bid Date: May 19 2023
Dyess AFB, TX
--
Dyess AFB, TX
Bid Date: Jul 27 2023
Dyess AFB, TX
Bid Date: Apr 06 2023
Dyess AFB, TX
Bid Date: Mar 03 2023
Dyess AFB, TX
Bid Date: Mar 11 2024
Dyess AFB, TX
Bid Date: Sep 26 2022
Dyess AFB, TX
Bid Date: Jul 25 2022
Dyess AFB, TX
Bid Date: Apr 28 2023
Dyess AFB, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.