BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Telluride, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Town of Telluride is seeking Bids for the 2020 Street, Alley and Utility improvements to include the following Work Items: Work Item #1: Milling, Patching & Paving. This portion of the WORK involves Pacific Ave. (Townsend St. to Spruce St.): Milling 2 inches of asphalt, and then placing 2 inches of new compacted asphalt (SX75 58-28). Areas with pavement failure following the milling operation will be identified and marked by the Engineer for full depth patch. All millings will be hauled to the wide spot on the Spur. Any asphalt removal with mixed materials will be hauled away. (See SAU Work Item #1 W. Pacific Ave.) Work Item #2: Milling, Patching & Paving. This portion of the WORK involves W. Colorado Ave. (Townsend St. to Aspen St.): Milling 2 inches of asphalt, and then placing 2 inches of new compacted asphalt (SX7558-28). Areas with pavement failure following the milling operation will be identified and marked by the Engineer for full depth patch. All millings will be hauled to the wide spot on the Spur. Any asphalt removal with mixed materials will be hauled away. Work Item #3: Asphalt Full Depth Patch. This portion of the WORK involves removing failed sections of asphalt and subgrade and replacing with a minimum of 6 inches of road and 6 inches of new asphalt (SX7558-28). All removed asphalt will be hauled away. #3a S. Townsend St. & W. Pacific Intersection #3b 300 Blk S. Pine Street, south of bridge #3c S. Davis St. (W. Pacific Ave. to Depot Alley) #3d W. Colorado Ave. & S. Davis St. intersection All locations will require traffic control and erosion control. The selected bidder will be asked to a Pre-Construction Meeting to discuss traffic control and schedule immediately after issuance of a Notice to Proceed All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the OWNER

Post-Bid

Roads / Highways

$635,000.00

Public - City

Paving, Site Work

5

17

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
4
Bidding Soon
73
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2023

April 10, 2023

img_map_placeholder

Multiple Locations, Telluride, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.